Download presentation
Presentation is loading. Please wait.
Published byLizeth Illingworth Modified over 10 years ago
14
Elevation Skilled & quality craftsmanship of Merlin tradition to make the complex a symbol of class. Foundation Reinforced cement concrete on piles. Treatment Anti-termite during various stages of construction. Walls External 10 Brick Wall, including plaster, paint/stone finished. Internal 5 Brick Wall with Plaster-of-Paris finish/ Sheer Walls of 3 Thick. Windows Heavy Duty Anodized Aluminum windows with glass panes. Door Entrance Panel door with elegant teak finish polish. Internal Teak finish Polished designer flush door polished with quality hardware. Floors Marble/ Vitrified tiles in entrance and floor lobbies. Vitrified tiles in internal flat areas. Elevators Well decorated lift car of OTIS/ KONE or equivalent brand. Facilities such as Electronic Surveillance, Intercom, Generator, Water Treatment Plant, Swimming pool, Membership to The Residents Club and separate line for KMC water in Kitchen are free of cost. Electrical PVC conduit pipe with copper wiring, MCBs/ ELCBs, modular of best brands Switches with sufficient power points for necessary gadgets, call bell/telephone/ T.V. points. Security Round the clock electronic security & surveillance system with emergency alarm, fire fighting system etc. Water supply 24 hours water supply through UG & OH reservoirs with water treatment Plant. Facilities Landscaped greenery, childrens play area, swimming pool, gym, A.C. community hall. Kitchen Granite kitchen platform with stainless steel sink having drain board with Lauret or equivalent brand fittings. Toilets Designer ceramic tiles on the walls upto the door height and anti skid ceramic tiles on floor. Height and anti skid ceramic tiles on floor. Sanitary Plumbing Concealed pipeline for hot/cold water, light colored WC & wash Basin of Hindustan/ Parryware or equivalent brands. Sanitary Fittings C.P. fittings of jaquar/ Ess Ess or equivalent brand.
17
See, What the existing customers say ….
20
PAYMENT SCHEDULE SL NO.PERCENTAGE OF CONSIDERATION PARTICULARS 115% ON BOOKING / SIGNING OF AGREEMENT 215% ON COMPLETION OF FOUNDATION WORK 310% ON COMPLETION OF 2 ND FLOOR CASTING 410% ON COMPLETION OF 4 TH FLOOR CASTING 510% ON COMPLETION OF 6 TH FLOOR CASTING 65% ON COMPLETION OF 8 TH FLOOR CASTING 75% ON COMPLETION OF 10 TH FLOOR CASTING 85% ON COMPLETION OF 12 TH FLOOR CASTING 95% ON COMPLETION OF BRICK WORK 105% ON COMPLETION OF PLASTERING 115% ON COMMENCEMENT OF FLOORING 125% ON COMMENCEMENT PLUMBING WORK 135% ON POSSESSION
21
Thank You
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.