Download presentation
Presentation is loading. Please wait.
1
SPP V1 Project Management
John DeHart Applied Research Laboratory Computer Science and Engineering Department
2
Revision History 9/11/2007 (JDD): Created
3
Directory Structure Goals: Example current structure: Proposal:
Maintain SPP V0 and be able to fix bugs Work on SPP V1 enhancements Be ready for another round of big changes for SPP V2. Example current structure: PL stands for PlanetLab techX/Diversified_Router/trunk/src/applications/LC_Ingress/ build_4.3/PL *.dwp *.dwo dispatch_loop/dl_system.h scripts src/counter/PL/counter.uc src/hdr_format/PL/hdr_format.uc src/key_extractor/PL/key_extract.uc src/lookup/PL/lookup.uc … techX/Diversified_Router/trunk/src/IXA_SDK_4.3 src/building_blocks/rx/microengine/packet_rx/microcode/packet_rx*.uc src/building_blocks/tx/microengine/sphy_mphy4_2800/sphy*.uc Proposal: Change ‘PL’ to SPP_V0 Add SPP_V1 directories in parallel with SPP_V0 Copy current files from SPP_V0 directories to SPP_V1 as starting point for V1 changes. Example: build_4.3/SPP_V0 build_4.3/SPP_V1 src/lookup/SPP_V0/lookup.uc src/lookup/SPP_V1/lookup.uc
4
Extra Slides The rest of the slides are old or are for extra information
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.