Presentation is loading. Please wait.

Presentation is loading. Please wait.

The Art of Integration High Commission of Canada September 2016.

Similar presentations


Presentation on theme: "The Art of Integration High Commission of Canada September 2016."— Presentation transcript:

1 The Art of Integration High Commission of Canada September 2016

2 DELIVERING ON BUILDING PERFORMANCE
ENERGY SERVICES DELIVERING ON BUILDING PERFORMANCE Alasdair Donn

3 Building Performance – What ?
kWhr CO2 £££ Workplace People

4 Building Performance – Why ?
Cost T Q P Performance Time Quality

5 Building Performance – How ?
Stage 1: Inception and briefing Stage 2: Design, construct Stage 3: Pre-handover Stage 4: Initial aftercare Stage 5: Extended aftercare & POE What factors are affecting the performance of my building ? How can I improve the performance of my building ? Building performance - context of performance as increasingly important client requirement (CTQ-CTQP) - energy/carbon/operating cost issues - people/workplace productivity issues - importance of delivering on expectations re long-term client satisfaction

6 Case Study – Cardiff School of Art & Design

7 Case Study – Oakfield Primary School

8 Case Study – Oakfield Primary School

9 Case Study – Keynsham Civic Centre

10 4 The Square, Stockley Park

11 4 The Square, Stockley Park

12 1 Puddle Dock

13 1 Puddle Dock

14 Centre for Medicine, University of Leicester

15 C Time Q T Quality P Performance Cost

16 The Art of Integration Efficient devices Real Efficiency
Efficient controls Enhanced Monitoring


Download ppt "The Art of Integration High Commission of Canada September 2016."

Similar presentations


Ads by Google