Download presentation
Presentation is loading. Please wait.
Published byKatelynn Reamy Modified over 10 years ago
2
Computer Generated Reports WHERE TO BEGIN
3
AIMS Challenge Your Current Reporting Process Improve Your Understanding of Computer Generated Reports Identify Opportunities & Products Manage the Changing Process
4
Challenge Master Document Auto text Template Data Capture System
5
Master Document Multiple selections included in template. Roof: The mortar bed and pointing to the ridge capping is cracked and requires re bedding and pointing. Approximately ____ tiles are cracked and should be replaced. Visible deflection was noted to the roofline over the ______ elevation. For more detail, see section under "Attic & Roof Timbers". The pitch of the roof over ____ is inadequate. This may allow wind driven rain penetration and remedial action is required. The metal roof is rusting and requires repair or replacement. Impact damage noted to ______ will need repair or replacement is required.
6
Master Document Final report excludes unwanted items. Roof: The mortar bed and pointing to the ridge capping is cracked and requires re bedding and pointing. The metal roof is rusting and requires repair or replacement.
7
Auto Text The shower recess was tested … (Press ENTER to insert) Inserts pre defined text automatically. Part of the text is entered and computer prompts a pre set entry. Showe The shower recess was tested and found to be leaking. To correctly repair a leaking shower recess would involve removing the floor tiles, wall tiles and wall linings (where applicable), appropriately waterproofing the area or fitting a shower tray. Walls should then be re-lined (if necessary), re-tiled and the floor re-tiled. As a guide only, the cost to repair a leaking shower is upward from $1,500.00 plus the purchase price of tiles.
8
Template Sub Floor Ventilation: Ventilation is important to minimise infestation by timber pests and preventing damp problems. It is considered that ventilation in this property is: Inadequate Adequate Good Not Applicable
9
Data Capture
10
Report Process Inspect Building Data Gathering Add Commentary Extract Summary Format Report Deliver Report
11
Report Process - Revised Inspect Building Data Gathering Deliver Report Format Report Extract Summary Add Commentary COMPUTER
12
Plotting Your Position 1.Paper report format – photocopy/carbon copy – issue fax/mail 2.Checklist – rework to PC – proof – edit – issue print/fax/email/mail 3.Checklist – phone office w/details – proof – edit – issue print/fax/email/mail 4.Dictaphone - rework to PC – proof – edit – issue print/fax/email/mail 5.Handheld PC – Synchronise to PC - edit – issue print/fax/email/mail
13
Whats Available - Direction Word bases templates Rapid RSA Electronic infield collection 3D Inspection Reports Temisoft Systems available generally fall into two categories:
14
Next Generation Beyond -------------------------------- 21 st Century –Wearable PC – Voice activation – Instant heads-up review – Virtual tour – Real time online report.
15
Questions?
16
Revision Instrument 1.What two tasks are computers generally used you? Repetitive tasks and Storage of data 2.What items can a computer perform to assist report generation? Add Commentary, Extract Summary and Format Report 3.Can you still use a check list in the field and in conjunction with computer generated reporting? Yes 4.What are the two systems available in the market? Word document based systems Electronic infield data collection systems 5.What electronic device is used to record information infield and later synchronised to the report? PDA
17
Presentation Evaluation Presentation title: Computer Generated Reporting Presenter: Dale Kennedy Strongly DisagreeDisagreeNeutralAgree Strongly Agree Quality Overall quality of presentation was high.12345 This information will be beneficial to my professional development. 12345
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.