1 VSOUi - VSOOrchestra Integration Test
Christian Hörwick 26 January 2006

2 Double Test: VSOUI -VSOOrchestra
Tracking VSOUI VSO- Orchestra VSOVideo VSOAudio

3 UI - VSO Application Phases UI VSOApplication I II III IV
Initialize method status: done a complete loaded orchestra II possibility to show different cameras status: in progress (time: 4 hours) a bundle of cameras III possibility to display tracking (time: 8 hours) Tracking view IV UI interface for switching between modes (Listener-, Conductor-mode) possibility to switch between modes Christian Hörwick

4 UI - Orchestra UI Orchestra Christian Hörwick Phases I
Add & remove musician Attach audio & video file status: done Responding to the correlated actions II Load & save orchestra configuration status: Load in progress time: 4 hours III Show & move musicians & Conductor Provide conductor & musician positions (set, get) IV Initialize & start server mode status: in progress V Stop server mode Christian Hörwick