Presentation is loading. Please wait.

Presentation is loading. Please wait.

Planned Group Activity Outline

Similar presentations


Presentation on theme: "Planned Group Activity Outline"— Presentation transcript:

1 Planned Group Activity Outline
September Workshop Planned Group Activity Outline

2 Workshop Activity (exercises / groupwork)
Successfully complete an acceptable IMDS submission to their assigned OEM working in teams of 10. Each team will be broken down into supplier tiers 1-3 and a single raw material supplier. Workshop activity will require the following: Tier 1 supplier will submit requests and receive data from their Tier 2 suppliers (2 sub-groups) Tier 2 suppliers will submit requests and receive data from their Tier 3 supplier (1 sub-group) Tier 1 supplier, Tier 2 suppliers and Tier 3 supplier will submit requests and receive data from the Raw Material suppliers (1 person from each team = total of 5 raw material suppliers submitting data to all of the 5 teams)

3 Tier 3 requests to Raw Material Suppliers
Team of 10 Supplier Tier Breakdown OEM OEM request to Tier 1 Tier 1 requests to Tier 2s Tier 2 requests to Tier 3 Tier 3 requests to Raw Material Suppliers Tier 1-3 requests to Raw Material Suppliers (1 team member from each of the 5 teams)

4 Proposed Raw Material Suppliers (by type)
Polymeric Filled with and without prohibited substance (e.g. zinc oxide) Polymeric Unfilled Coatings with and without prohibited substance (e.g. dibutyltin- oxide) Adhesives Raw material with prohibited substance lead content (e.g. ceramic, glass, solder)


Download ppt "Planned Group Activity Outline"

Similar presentations


Ads by Google