Presentation is loading. Please wait.

Presentation is loading. Please wait.

Wesley Evermon IDM 404 Spring 2018

Similar presentations


Presentation on theme: "Wesley Evermon IDM 404 Spring 2018"— Presentation transcript:

1 Wesley Evermon IDM 404 Spring 2018
IDM 487 Senior Design Project: Steel Services Inc. Prepared by: Wesley Evermon Client: Steve Schwartz Steel Services Inc.) Technical Advisor: Dr. Pablo Biswas 1/19/2018 Wesley Evermon IDM 404 Spring 2018

2 Wesley Evermon IDM 404 Spring 2018
Team Members Chris Howard – Industrial Engineer Stefan Brown – Industrial Engineer Issa Ford – Industrial Engineer 1/19/2018 Wesley Evermon IDM 404 Spring 2018

3 Wesley Evermon IDM 404 Spring 2018
Steel Services Inc. General line metal fabrication shop. Provides a wide range of custom metal processing services. Customers: railroad, airports, bluebird, mining. Fabricate large products “If it fits into the back seat of a car, it’s too small.” 1/19/2018 Wesley Evermon IDM 404 Spring 2018

4 Wesley Evermon IDM 404 Spring 2018
Project Focus Problem: Trouble estimating labor hours/time it takes to complete tasks for a new product. Conduct time studies to create generic formula to help estimate new project completion times. 1/19/2018 Wesley Evermon IDM 404 Spring 2018


Download ppt "Wesley Evermon IDM 404 Spring 2018"

Similar presentations


Ads by Google