Download presentation
Presentation is loading. Please wait.
Published byEli Holder Modified over 10 years ago
1
Sunny day, installing exterior casings on the windows
2
South side of course, sun on our backs
3
Lots of snow, weve hardly seen the sun
4
Up and down the ladders
5
Behind the brick we removed for the new kitchen window we found a yellow marble in the mortar
6
Drip cap over the top window casing
7
Preparing to build the new kitchen window box
8
Eyebrow windows replace one old window
9
Preparing the dormer for siding
10
East side faces the morning sun
11
At Dashwood Industries to pick up new windows for the kitchen
12
Dump trailer – were going to take apart the old kitchen
13
All of this is coming out
14
Remove the cabinet doors/drawers first
15
Old plaster requires plastic to stop the migration of dust
16
Pluck the upper cabinets
17
Help arrives
18
Pulling down the ceiling tiles and plaster
19
Separate the lath from the plaster
20
This is only part of the removal process
21
Wood goes in the trailer, plaster in the tractor bucket
22
Dust masks required
23
Even Pop gets to help
24
We found this copper tray between the ceiling joists. No drain so its a mystery what it was used for.
25
The copper tray sat on the 2x2 cleats between the joists
26
Plumbers love to cut away joists to fit pipes leaving no strength in the joist. A repair will be required.
27
Supports to level the ceiling joists while changes to the window opening are made
28
The window box is framed in and the new window installed
29
Now we take away the temporary supports
30
Carter finds a new lookout
31
Did you build this for me?
32
New header over the wide opening to the link
33
The lintel has to be big to support a beam when the center wall is removed (on the right)
34
Temporary supporting walls to hold up the ceiling joists while the old partition wall is removed and replaced with a beam
35
A maze of wood
36
Original partition wall removed
37
New built-up beam replaces the wall
38
Remove the temporary support walls
39
Opens everything up for the new kitchen
40
From the link looking into the new kitchen area
41
New awning window installed in the kitchen
42
Ryan cleans up
43
An awning window allows ventilation even on a rainy day
44
Filling in the gaps where the old entrance was
45
Time to trim the inside of the window box