Planning best practice tailings disposal, management and rehabilitation strategies Presented by Mike Gowan
2
Tailings – Brisbane 28/02/06 2 The Simple Early Mining Life
3
Tailings – Brisbane 28/02/06 3 Before TSFs – Sand Dumps
4
Tailings – Brisbane 28/02/06 4 The Simple Life – Cocopan Haulage
5
Tailings – Brisbane 28/02/06 5 Before Tailings Pumping Systems
6
Tailings – Brisbane 28/02/06 6 Early TSF Construction
7
Tailings – Brisbane 28/02/06 7 TAILINGS STORAGE FACILITIES Named a TSF Includes: Storage walls and footprint Slurry pipelines Return water dam Return water system But they do not always store the tailings
8
Tailings – Brisbane 28/02/06 8 Kalgoorlie before Kaltails Wind and Water Erosion
9
Tailings – Brisbane 28/02/06 9 TSFs Largest dams ever built – seen from space Unlike water dams, have to last for ever Normally built progressively over a long period – up to 50 years Often built with non-engineering materials Should be considered as a living entity
10
Tailings – Brisbane 28/02/06 10 20 Years On using Tailings! Upstream raised gold TSF
11
Tailings – Brisbane 28/02/06 11 Mining Realities Mining a continuous operation TSF at the back end of the operation Generally out of sight and out of mind A cash consumer, not a cash contributor A source of constipation when they go wrong Do it right the first time!!!
12
Tailings – Brisbane 28/02/06 12 TSF Failures At least 2 TSF failures reported annually Many more not reported Failure includes: Wall failure Wall breach Overtopping Release of contaminated liquor Contaminated seepage
13
Tailings – Brisbane 28/02/06 13 Unreported Wall Failure Out of Sight
14
Tailings – Brisbane 28/02/06 14 Unreported TSF Failure No Injuries
15
Tailings – Brisbane 28/02/06 15 Unreported Contaminated Flow Contained
16
Tailings – Brisbane 28/02/06 16 In-River Tailings Disposal In river
17
Tailings – Brisbane 28/02/06 17 Result of Failures? Poor public perception Omai Baie Mare Marcopper Los Frailes Leads to a lack of trust
18
Tailings – Brisbane 28/02/06 18 Failures No TSF failures are unexpected All failures can be predicted with hindsight Failures due to one or more of: Poor design Poor construction management Poor operation Changing management during operation Lack of rigorous and regular inspection
19
Tailings – Brisbane 28/02/06 19 OUR DUTY AS DESIGNERS Carry out a rigorous design Provide the owner with clear operating guidelines Stand-up for our role Record, assess and advise
20
Tailings – Brisbane 28/02/06 20 Appropriate Tailings Disposal Design must: Meet project requirements Satisfy legislative standards Follow current engineering knowledge Look to better environmental expectations
21
Tailings – Brisbane 28/02/06 21 Transportation Low solids content slurry High solids slurry Paste Cake Dry
22
Tailings – Brisbane 28/02/06 22 Ash - 12% Solids
23
Tailings – Brisbane 28/02/06 23 Diamonds - 45% Solids
24
Tailings – Brisbane 28/02/06 24 Gold - 70% Solids
25
Tailings – Brisbane 28/02/06 25 Tailings Placement Pumping Low solids content High solids content Conveying Trucking or railing
26
Tailings – Brisbane 28/02/06 26 Conventional 2 Stage Pumping for Codisposal
27
Tailings – Brisbane 28/02/06 27 Paste 1 MW Diaphragm Positive Displacement Pump - Flyash
28
Tailings – Brisbane 28/02/06 28 Conveying Flyash Dry Flyash Dewatered Tailings
29
Tailings – Brisbane 28/02/06 29 Trucking Flyash
30
Tailings – Brisbane 28/02/06 30 Why Change? The drier the tailings the lower: Water losses Chemical losses Risks of environmental contamination Rehabilitation costs Increased risk of: Dust Erosion
31
Tailings – Brisbane 28/02/06 31 Dust & Erosion Dust Erosion
32
Tailings – Brisbane 28/02/06 32 Understand the Tailings Seepage Water quality Dust Radiation Instability Geomorphological processes
33
Tailings – Brisbane 28/02/06 33 Seepage in a Dry Environment HDPE Liner to reduce Seepage
34
Tailings – Brisbane 28/02/06 34 Radiation Subaqueous to reduce Radiation
35
Tailings – Brisbane 28/02/06 35 Accidents do Happen!! The Human Element
36
Tailings – Brisbane 28/02/06 36 Mine Expansion Two mining realities: The full tonnage is achieved well ahead of schedule More ore is found SO: Plan for full tonnage earlier Consider expansion Do not limit expansion through design Consider the next TSF site
37
Tailings – Brisbane 28/02/06 37 Conclusion Endeavour to place tailings back in mine Legislated in California Plan for tailings retreatment Provide comprehensive Operational Management Documentation
38
Tailings – Brisbane 28/02/06 38 Coal Tailings In Final Void
39
Tailings – Brisbane 28/02/06 39 Paste Backfilling Underground Paste Backfill
40
Tailings – Brisbane 28/02/06 40 In-Pit Codisposal - Gold Tailings Waste
41
Tailings – Brisbane 28/02/06 41 The End My thanks to: Fraser Alexander for old photos Mining clients for use of project photos Various authors quoted without reference My colleagues who keep me on my toes!!??