Download presentation
Presentation is loading. Please wait.
1
Productivity Improvement
2
Continuous Improvement
Standard Operations Visual Management 7 Wastes 5 S
3
Available Minutes for Production
Step #1: Adjust your rhythm on the customer’s Takt Time. Takt Time = Available Minutes for Production Required Units of Production Work Force = Σ Manual Cycle Time Takt Time
4
Batch production Vs One Piece Flow
Step #2: Create a continuous flow each time it’s possible. Continuous Flow = Realisation of one piece at the time without any waiting time between each process. Batch production Vs One Piece Flow
5
Step #3: Level the workload across all processes into the cell.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.