1 TGIC - Reverse Industry Day
Industry Rep – Pyron 06 June 2018

2 Areas of Interest Program Operations and Contracts
LPTA and Best Value Pricing Data Rights Program Risk

3 Actual Work versus Requested RFP Language
Meet Program requirements - Requirements that match the Position Descriptions Technical Services Engineering Total Ownership Cost vs. Acquisition Cost SBSA: Indicate interest on Market Survey or RFI, then fail to propose. Result = Government & Industry quandary. OKAY for Contracts to talk with Industry Collaboration is not a four-letter word Follow standard sequence of Systems Engineering Plan and promulgate the Acquisition Strategy & Plan Allows Industry to better align resource planning & IRAD

4 Summary OBJ: Program OPS and Contracts in better alignment
Example: increase SB require content in PWS; use CPARS to hold Industry accountable Follow classic systems engineering practice Market Survey/Interest (could be preceded by BAA or SBIR) Request For Information Draft RFP with full Tech Data Package (TDP) or Performance Work Specification (PWS) Questions & Answers; Government Office Calls; Site Visits Industry Day; 1:1’s Amended Draft RFP, or straight to RFP Site Surveys; Oral Presentations; BAFO; Engineering Notices Key: industry communication until RFP is released. Contracting Strategy pendulum swing back to amidships Opportunity exists for active, positive, mutually beneficial communication

5 Contact Information John Pyron WR Systems - Vice President Fairfax Office: Random Hills Road Fairfax, VA (703) (Office) (434) (Mobile) Hampton Roads Address: 2500 Almeda Avenue Norfolk, VA (757)