Download presentation
Presentation is loading. Please wait.
Published byMuhammad Zunair Modified over 6 years ago
1
Forced draft cooling tower
2
NumberingEquipment A-1Storage Tank B-2Temperature sensor C-3Pump D-4Ball valve E-5Rotameter F-6Cooling water from the tank G-7Cooling water outlet temperature H-8blower
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.