Presentation is loading. Please wait.

Presentation is loading. Please wait.

RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016.

Similar presentations


Presentation on theme: "RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016."— Presentation transcript:

1 RNAV-RNP CERTIFICATION SUMMARY12016

2 RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016

3 PBN – RNAV-RNP REQUIREMENTS RNAV-RNP CERTIFICATION SUMMARY32016

4 PBN – PEFORMANCE DESIGNATION RNAV-RNP CERTIFICATION SUMMARY42016

5 PBN – DESIGNATIONS AT THE PRESENT TIME !!! RNAV-RNP CERTIFICATION SUMMARY52016

6 ADVANCED RNP (A-RNP) AND RNAV-RNP COMPARISON RNAV-RNP CERTIFICATION SUMMARY62016

7 APPROACH DESIGN CRITERIA RNAV-RNP CERTIFICATION SUMMARY72016

8 NAVIGATION REQUIREMENTS SUMMARY RNAV-RNP CERTIFICATION SUMMARY82016

9 PBN – RNAV X, RNP X IMPLEMENTATION RNAV-RNP CERTIFICATION SUMMARY92016

10 RNAV-RNP EASA CERTIFICATION CRITERIA (AMC) RNAV-RNP CERTIFICATION SUMMARY102016

11 APPROACH & LANDING REQUIREMENTS RNAV-RNP CERTIFICATION SUMMARY112016

12 PBN IN EUROPE BY FLIGHT PHASES RNAV-RNP CERTIFICATION SUMMARY122016

13 NAVIGATION DISPLAY CONSIDERATIONS Navigation information used by the pilot for steering commands and to monitor deviation from a navigation path shall be in the pilot's primary FOV. Warnings and cautions shall also be in the primary FOV. If information from more than one navigation source can be presented, the selected source should be continuously indicated to the pilot. If multiple sources can be presented simultaneously, the display should indicate unambiguously what information is provided by each source and which one has been selected for guidance. RNAV-RNP CERTIFICATION SUMMARY132016

14 FAA – RNAV-RNP GUIDANCE MATERIAL FOR AIRWORTHINESS APPROVAL (AIW) AC 25-4* Inercial Navigation Systems (INS) AC 25-15*Approval of Flight Management Systems in Transport Category Airplanes AC 20-129*Airworthiness Approval of Vertical Navigation (VNAV) Systems for Use in the U.S. National Airspace System (NAS) and Alaska AC 20-130*Airworthiness Approval of Navigation or Flight Management Systems Integrating Multiple Navigation Sensors AC 20-138D Airworthiness Approval of Positioning and Navigation Systems. RNAV-RNP CERTIFICATION SUMMARY14 * Cancelled 2016

15 FAA - GUIDANCE FOR OPERATIONAL AUTHORIZATIONS (OPS) AC 90-97()Use of Barometric Vertical Navigation (VNAV) for Instrument Approach Operations Using Decision Altitude AC 90-100()U.S. Terminal and En Route Area Navigation (RNAV) Operations AC 90-101()Approval Guidance for RNP Procedures with AR AC 90-105()Approval Guidance for RNP Operations and Barometric Vertical Navigation AC 90-107()Guidance for Localizer Performance with Vertical Guidance and Localizer Performance without Vertical Guidance Approach Operations in the U.S. National Airspace System RNAV-RNP CERTIFICATION SUMMARY152016

16 FAA RNP BASIC vs AR: KEY DIFFERENCES RNAV-RNP CERTIFICATION SUMMARY16 EASA AMC 20-26AMC 20-27AMC 20-28 2016

17 RNAV-RNP APPROVAL CRITERIA (EASA vs FAA) TYPE OF RNAV-RNPEASA (AIW+OPS)FAA (OPS) EUR B-RNAV (RNAV 5) AMC 20-4AC 90-96A EUR P-RNAV (RNAV 1) JAA TGL Nº10AC 90-96A Oceanic RNAV Navigation(RNP-10) AMC 20-12 FAA Order 8400.12a RNP Approach with Required Authorization (RNP AR) AMC 20-26AC 90-101 RNP Approach including APV BARO-VNAV AMC 20-27 EASA CM – AS – 002 AC 90-97 AC 90-105 RNAV Apporch with LPV based on SBAS (WAAS, EGNOS) AMC 20-28AC 90-107 2016RNAV-RNP CERTIFICATION SUMMARY17

18 FAA/EASA RNAV/RNP TSO EQUIPMENT TSO-C115()Airborne Area Navigation Equipment using MultiSensor Inputs TSO-C129()Airborne Supplemental Navigation Equipment Using the Global Positioning System (GPS) (Cancelled) TSO-C145(AR)Airborne Navigation Sensors Using the Global Positioning System (GPS) Augmented by the Wide Area Augmentation System (WAAS) TSO-C146(AR)Stand-Alone Airborne Navigation Equipment Using the Global Positioning System (GPS) Augmented by the Wide Area Augmentation System (WAAS) TSO-C106(AR) Air Data Computer RNAV-RNP CERTIFICATION SUMMARY182016

19 RNAV/RNP; EUROCAE ↔ RTCA STANDARDS ED­75/DO­236Minimum Aviation System Performance Standards: Required Navigation Performance for Area Navigation DO­283AMinimum Operational Performance Standards for Required Navigation Performance for Area Navigation ED­76 / DO­200AStandards for Processing Aeronautical Data ED­77 / DO­201AStandards for Aeronautical Information DO-187Minimum operational performances standards for airborne area navigation equipments using multi­sensor inputs DO­229()Minimum Operational Performance Standards for Global Positioning System/Wide Area Augmentation System Airborne equipment ARINC 424Navigation System Data Base RNAV-RNP CERTIFICATION SUMMARY192016

20 RNAV/RNP COMPLIANCE METHODS Design Review: –Equipment Qualification Data –Installation Drawings & Specifications –System Safety Assessment (FMEA, FTA) –Installation & Operation Manuals from OEM –Supplements Drafted for Aircraft Flight Manual Navigation Performance Analysis (Only for RNP). Cockpit Evaluation (Indications & Annunciations) Ground Test Results Flight Test Results & Analysis (Specially for RNP) Navigation Performance Simulations (Only possible by TC Holders) RNAV-RNP CERTIFICATION SUMMARY202016

21 RNP APPROACHES - VERTICAL GUIDANCE RNAV-RNP CERTIFICATION SUMMARY212016

22 RNAV APPROACH CHARTING TERMINOLOGY RNAV-RNP CERTIFICATION SUMMARY22 RNP APCH = RNAV (GNSS) or RNAV (GPS) RNP AR = RNAV (RNP) (to keep it simple!) 2016

23 RNAV GLIDEPATH CHART 2016RNAV-RNP CERTIFICATION SUMMARY23

24 MINIMUM OCH PER APPROACH TYPE RNAV-RNP CERTIFICATION SUMMARY242016

25 CERTIFICATION OF NAVIGATION SYSTEMS To certify an advanced navigation system, it must take into account the conditions and airspace infrastructure for which will approve Is therefore very important that the competent authority has issued relevant guidance material (AMC), with the certification criteria The review and understanding of this guidance material is essential before starting any certification process Most of the information must be provided by equipment manufacturer (OEM) They often prepared a checklist (Checklist), to facilitate the task of operators and authorities 2016RNAV-RNP CERTIFICATION SUMMARY25

26 WORKING METHOD FOR RNAV/RNP CERTIFICATION Determine the AMC/AC to be used according with the scope of the TC/STC application (See the proposed draft for AFMS) Prepare the Compliance Matrix (CCL) against the corresponding AMC/AC Get from OEM the following data: –Manuals for Equipment Installation & Operation –Equipment Qualification Data & Failure Analysis –Evidence of previously approved installations –Ground & Flight Test Procedures –Draft of AFM Supplement Consider the need to perform flight tests on sites that meet certain conditions (Runways with Approach Procedures published) Agree with the Authority the participation in Certification Test RNAV-RNP CERTIFICATION SUMMARY262016


Download ppt "RNAV-RNP CERTIFICATION SUMMARY RNAV-RNP EVOLUTION RNAV-RNP CERTIFICATION SUMMARY2 On-Board Navigation Monitoring 2016."

Similar presentations


Ads by Google