Presentation is loading. Please wait.

Presentation is loading. Please wait.

November 2005 Vancouver Meeting Slides

Similar presentations


Presentation on theme: "November 2005 Vancouver Meeting Slides"— Presentation transcript:

1 November 2005 Vancouver Meeting Slides
Doc.: IEEE /1140r2 November 2005 November 2005 November 2005 Vancouver Meeting Slides Date: Authors: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures < ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at Charles R. Wright, Azimuth Systems, Inc. Charles R. Wright, Azimuth Systems, Inc.

2 Welcome to TGT Evaluation of 802.11 Wireless Performance
Doc.: IEEE /1140r2 November 2005 November 2005 Welcome to TGT Evaluation of Wireless Performance Charles R. Wright Charles R. Wright, Azimuth Systems, Inc. Charles R. Wright, Azimuth Systems, Inc.

3 Sign In!!! A Friendly Reminder…
Doc.: IEEE /1140r2 November 2005 November 2005 A Friendly Reminder… The attendance server on 802wirelessworld will not be in operation this week Attendance will be recorded on a sign-in sheet Between 8 AM and 5 PM, go to the registration desk and sign the sheet and indicate how many of the meetings that day you did or will attend Do this once a day Sign In!!! Charles R. Wright, Azimuth Systems, Inc. Charles R. Wright, Azimuth Systems, Inc.

4 November 2005 Be Aware… Do not leave your laptop or personal items unattended in meeting rooms Charles R. Wright, Azimuth Systems, Inc.

5 Proposed Agenda for Vancouver Meetings
Doc.: IEEE /1140r2 November 2005 November 2005 Proposed Agenda for Vancouver Meetings Chair comments Appoint secretary Approval of agenda Approve minutes 11-05/0955r0 – Garden Grove 11-05/1100r1 – Nov 03 Telecon Call for presentations T. Alexander, 11-05/676r1, “Link Layer Metrics Proposal” 45 min (Tues) D. Ward, 11-05/1043r0, 11-05/1044r0, “Test Practices and Test Equipment” 45 min (any time) D. Ward, 11-05/1101r0, “Suggested additions to the test template” 30 min (any time) L. Green, “Theoretical throughput limits” 11-05/1050r0, 30 min (any time) M. Foegelle, 11-05/1040r0, “Understanding the implications of link budgets”, 30 min (any time) F. Pirzada, 11-05/0969r1, “Document Framework Section”, 30 min (Wed) S. Bangolae, 11-05/537r2, “Test Methodology Proposal for Measuring Fast BSS/BSS Transition Time” 30 min (Wednesday) Fanny Mlinarsky, 11-05/1109r0 “Latency Sensitive Usage Case”, 45 min (Wed needed) Uriel Lemberger, 11-05/1158r0, “Receiver sensitivity”, (proposed draft text: 11-05/1157r0), 60 min (maybe today, better Wed) U. Lemberger, 11-05/1194r0, “Video testing methodology”, 60 min (Wed/Thu) U. Lemberger, 11-05/1198r0, “Transmit EVM”, 60 min (Thursday) Process discussions Editor’s report Presentations in Item 5 as they are ready New Business Uriel’s revised sensitivity Tom’s revised link layer metrics Mesh performance and Metro Ethernet Forum Max theoretical throughput Future telecons Review slide 11 from 11-05/912r1 (expected proposals) TGT Issues List, 11-05/1024r0 Charles R. Wright, Azimuth Systems, Inc. Charles R. Wright, Azimuth Systems, Inc.

6 Meeting Schedule for week
November 2005 Meeting Schedule for week Monday Tuesday Wednesday Thursday 8:00 TGT Ad Hoc 9:30 10:30 12:30 Lunch 1:30 Opening, confirm secretary, call for presentations, start presentations TGT TGT 3:30 4:00 TGT TGT TGT Closing business 6:00 Dinner 7:30 9:30 Charles R. Wright, Azimuth Systems, Inc.

7 TGT Plan Of Record As discussed in Garden Grove session…
November 2005 TGT Plan Of Record As discussed in Garden Grove session… Used as input to the TG milestones table Step 1 complete after March meeting All important pieces in place at this time TG internal review to start after March meeting Comments resolved in May meeting New draft created and circulated before July meeting Additional comment resolution during July Plan to vote on going to LB at July meeting Update the timeline for LB in July 2006 All other dates in milestones table will be updated accordingly Charles R. Wright, Azimuth Systems, Inc.

8 TGT Standards Process Milestones
November 2005 TGT Standards Process Milestones Dates are updated from our discussion on Tuesday We are here 2005 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1st LB 1st Recirc 2nd Recirc 2006 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 1st SB SB Recirc 2007 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec WG/SEC approval REVCOM approval 2008 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Charles R. Wright, Azimuth Systems, Inc.

9 Motion Move to Moved: Second: Yes/No/Abs: November 2005
Charles R. Wright, Azimuth Systems, Inc.

10 November 2005 New Business Possible telecons if we follow our current “every two weeks” schedule: 1 Dec 05, 15 Dec 05, 12 Jan 06 Discussion of work to be done on teleconferences Telecon 1 – DJ Shyy presentation, summary of Vancouver meeting Telecon 2 – Discussion of D0.5 Telecon 3 – Preparation for Hawaii, announcement of proposals, presentations Charles R. Wright, Azimuth Systems, Inc.

11 Telecons between November and January 802.11 meetings
Motion to empower TGT to hold telecons Time: 12 noon Eastern (US) time Duration: 1 hour Dates: 1 Dec 2005, 15 Dec 2005, 12 Jan 2006 Moved/second: F. Pirzada/M. Foegelle Unanimous consent Charles R. Wright, Azimuth Systems, Inc.

12 Backup Information November 2005
Charles R. Wright, Azimuth Systems, Inc.

13 TGT Approved Document List
November 2005 TGT Approved Document List 11-04/1553r2, “Guidelines for TGT Formal Metric and Methodology Proposals” 11-05/912r2, “TGT Process Document” Charles R. Wright, Azimuth Systems, Inc.

14 Teleconference Info Date: Thursdays
November 2005 Teleconference Info Date: Thursdays Time: 12 Noon Eastern time (1700 UTC) Duration: 1 hour Phone #  International: Passcode: Next: TBD Charles R. Wright, Azimuth Systems, Inc.

15 November 2005 Reflector reflectors: Requires membership to send to it Getting on the reflectors Send an to Harry Worstel with a cc to Al Petrick and Stuart Kerry requesting to be put on the reflectors Instructions are contained in every reflector posting for customizing your reflector experience (including unsubscribing) rules require all TG communication to be through reflector Charles R. Wright, Azimuth Systems, Inc.

16 References for 802.11 Newcomers (1 of 2)
November 2005 References for Newcomers (1 of 2) Web site: Document server: Sign up for an account No need to be an member to get an account Once logged in, “join” : Click on “ WLAN WG” on left In center window, choose to become a new member Click again on “ WLAN WG” An additional subitem called “Documents” will be revealed – click on it You’ve reached the document server! Charles R. Wright, Azimuth Systems, Inc.

17 References for 802.11 Newcomers (2 of 2)
November 2005 References for Newcomers (2 of 2) Document numbering scheme WG-YY-NNNN-RR-gggg-English-document-title.ext WG = 802 working group number, e.g. “11” as in YY = two digits of year NNNN = document number RR = document revision number gggg = group to which the document pertains Example: wpp-telecon-agenda-19-feb-04.ppt Charles R. Wright, Azimuth Systems, Inc.


Download ppt "November 2005 Vancouver Meeting Slides"

Similar presentations


Ads by Google