OR 217 Interchange Management Study John Bosket, PE A la carte planning for an unpredictable fiscal future
3
120,000 ADT Beaverton Regional Center Downtown Portland Washington Square Regional Center Tigard Town Center
4
12 interchanges in 7 miles 2 lanes
5
2 nd Least reliable freeway
6
60% Non-recurrent congestion
7
70% 50% Rear end collisions Crashes in AM and PM peak periods
8
Photo by Michael Marcovici
9
Photo by Steve Rhodes
10
Is there a project we can afford that will make a difference?
11
mobilityreliability safety cos t
12
1. System management 2. Ramp management 3. Surface streets 4. Interchange improvements
13
1. System management 2. Ramp management 3. Surface streets 4. Interchange improvements
19
A menu of compatible projects
20
A range of project costs
21
A menu of compatible projects A range of project costs Flexible funding
22
A menu of compatible projects A range of project costs Flexible funding All projects advance the objective of improving reliability and safety
24
1.5 miles of shoulder widening Ramp meter upgrades 28 dynamic message signs on mainline and arterials Full detection and communications upgrades All new pavement By 2013
25
So…?
26
We can make a difference with less money
27
So…? Please keep sharing
28
John Bosket, PE