Presentation is loading. Please wait.

Presentation is loading. Please wait.

Changsheng Song Visit on Saturday 4 July

Similar presentations


Presentation on theme: "Changsheng Song Visit on Saturday 4 July"— Presentation transcript:

1 Progress in Beam-Breakup Calculations Jim Crittenden ERL@CESR Meeting 9 July 2009

2 Changsheng Song Visit on Saturday 4 July
We found a BMAD bug Now we can reproduce the calculations of ERL-0601 With Changsheng's original code and the latest BMAD With the new BMAD tracking (DCS)

3 ERL Fig. 11 2006 Lattice with PRST-AB 2007 HOMs and 10 Mhz frequency spread Changsheng code with new BMAD 2582 mA New BMAD Tracking 1822 mA

4 Benchmarking Study Examples from ERL-06-01 Table 9
All runs on processor LNX6166 No Coupling/Df=0/sf=0 Coupling/Df=60MHz/sf=0 Coupling/Df=60MHz/sf=10MHz CS Tracking mA 3.5 min mA min mA min BMAD mA min mA mA min

5 BBU Optimization of CERL Optics Now Underway
New linac optics received from Chris Mayes No improvement in threshold current so far. This is the first attempt, still much to learn

6 Two Alternative Sets of Linac Optics (Chris)
CERL 7.4 First Optimization Second Optimization


Download ppt "Changsheng Song Visit on Saturday 4 July"

Similar presentations


Ads by Google