City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting November 19, 2012.

Similar presentations


Presentation on theme: "City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting November 19, 2012."— Presentation transcript:

1 City of Fargo Mickelson Field Area Flood Risk Management – Project 5902 Public Information Meeting November 19, 2012

2 Overview/Why Are We Here Discuss Changes Since Last Meeting Discuss Changes Since Last Meeting Update Project Schedule Update Project Schedule Obtain Additional Public Comment Obtain Additional Public Comment Mickelson Flood Risk Management

3 Agenda Past Flood Fight Strategy (i.e. 2009,2010,…) Past Flood Fight Strategy (i.e. 2009,2010,…) Assessment of Flood Risk Assessment of Flood Risk Overview of Project Objectives Overview of Project Objectives Recommended Plan Recommended Plan –Changes since July Public Meeting Project Schedule / Financing Project Schedule / Financing Questions Questions Mickelson Flood Risk Management

4 2009 Spring Flood – Mickelson Area

5

6 2010 Spring Flood – Mickelson Area

7 Existing vs. Preliminary FEMA Floodplain EXISTING – RS 38.3± PROPOSED – RS 39.5±

8 Assessment of Flood Risk River Stage 25.0ft

9 River Stage 35.0ft Assessment of Flood Risk Oak Street Dike – Action Stage RS 30 – Inundation 34.6

10 River Stage 37.0ft Assessment of Flood Risk Emergency Dike Closure – Action Stage RS 31 – Inundation 36.0±

11 River Stage 38.0ft Assessment of Flood Risk

12 River Stage 39.0ft Assessment of Flood Risk

13 River Stage 40.0ft Assessment of Flood Risk FEMA 100-yr Flood Stage 39.5

14 River Stage 41.0ft Assessment of Flood Risk 2009 Spring Flood – RS 40.8

15 River Stage 42.0ft Assessment of Flood Risk

16 River Stage 42.5ft Assessment of Flood Risk USACE Recent Evaluation – 1% Flood in Fargo is 42.4?

17 Reduced Reliance on Temporary Flood Protection Reduced Reliance on Temporary Flood Protection –Clay levees, closures, and etc. Existing Storm Sewer Lift Station Improvement Existing Storm Sewer Lift Station Improvement –Reduce Internal Flooding Potential –Redundant Pumping Capacity Overview of Project Objectives

18 Construct Earthen Levee (RS 39.5+4.5) Construct Earthen Levee (RS 39.5+4.5) Abandon Lift Stations 29, 37, and 38 Abandon Lift Stations 29, 37, and 38 Construct New Combined Lift Station Construct New Combined Lift Station Storm Sewer Outlet Structure Storm Sewer Outlet Structure Storm Sewer Improvements Storm Sewer Improvements Dry Stormwater Pond Dry Stormwater Pond General Landscaping / Grading General Landscaping / Grading Impacts to Existing Park Facility – Fargo Park District Future Modifications Impacts to Existing Park Facility – Fargo Park District Future Modifications Recommended Plan

19 Save Field 2 Save Field 2 Relocate Recycle Center Relocate Recycle Center Preserving trees in NW Corner of Project Area Preserving trees in NW Corner of Project Area Changes as a Result of July Meeting

20 Mickelson Flood Risk Management

21

22

23

24 Recommended Plan Recommended Plan –Approximately $4.9 M± (Construction) Preliminary Funding Plan Preliminary Funding Plan –FEMA – HMGP Funding – Pending (75%) –Local Cost Share – City (25%) Project Schedule / Financing

25 Schedule Schedule –HMGP Grant Submittal –Recommended Project Design –Public Informational Meeting (7/12) –Revised Project Design – Public Comments –Final Plans / Specifications / Cost Estimates –Public Informational Meeting (tonight) Public Comment Period (Until 11/30) Public Comment Period (Until 11/30) –Right-of-way / Park District Approval (Dec 2012) –Anticipated Grant Approval (Mar 2013) –Recommendation to City Commission (Spring 2013?) –Permitting/Construction Bidding/Award Contract (Spring 2013?) –Anticipated Construction Begins (TBD – Summer 2013?) –Anticipated Construction Ends (TBD - Fall 2014?)

26 Comment Form

27 Questions / Discussion www.cityoffargo.com\Engineering Follow The Project On Twitter Mickelson Area Flood Risk Management – Project 5949