1 Installation of the support structure for the LHCb inner and outer tracking system (IT & OT)
Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF 12/31/2018 Sebastian Bachmann University of Heidelberg

2 University of Heidelberg
Working site Position for the Outer Tracker 12/31/2018 Sebastian Bachmann University of Heidelberg

3 University of Heidelberg
Main elements A-site C-site support bridge C-frame OT cable guidance support IT bottom table cable guidance 12/31/2018 Sebastian Bachmann University of Heidelberg

4 University of Heidelberg
Installation steps Bunker extension A / drilling holes in bunker 2. Tables on bunker 3. Pillars on bunker and ext. A 4. Alignment of pillars 5. Cable guidance on ext. A 6. Bridge installation and alignment 7. Complete alignment 12/31/2018 Sebastian Bachmann University of Heidelberg

5 Install bunker extension A + drill holes in bunker
12/31/2018 Sebastian Bachmann University of Heidelberg

6 Install bottom tables on bunker
12/31/2018 Sebastian Bachmann University of Heidelberg

7 Install and allign pillars
12/31/2018 Sebastian Bachmann University of Heidelberg

8 University of Heidelberg
- Install cable extension side A - Install bunker extension side C - Install cable guidance side C 12/31/2018 Sebastian Bachmann University of Heidelberg

9 Bunker, bunker extension, tables and cable guidance
Pillars not drawn! 12/31/2018 Sebastian Bachmann University of Heidelberg

10 University of Heidelberg
12/31/2018 Sebastian Bachmann University of Heidelberg

11 University of Heidelberg
Insert bridge 12/31/2018 Sebastian Bachmann University of Heidelberg

12 University of Heidelberg
Insert C-frames for OT 12/31/2018 Sebastian Bachmann University of Heidelberg

13 Installation of IT support
12/31/2018 Sebastian Bachmann University of Heidelberg

14 University of Heidelberg
Beam pipe in place 12/31/2018 Sebastian Bachmann University of Heidelberg

15 Installation of C-frames and IT support (A-site)
12/31/2018 Sebastian Bachmann University of Heidelberg

16 University of Heidelberg
Delivery of materials Bridge: Ready for shipment, delivery april, 4th or 5th Storage outside possible (stainless steel) Bottom table and cable guidance Storage in the cavern 12/31/2018 Sebastian Bachmann University of Heidelberg

17 University of Heidelberg
Support table 12/31/2018 Sebastian Bachmann University of Heidelberg

18 University of Heidelberg
Support bridge Long pillars (6m) 12/31/2018 Sebastian Bachmann University of Heidelberg

19 University of Heidelberg
Down the shaft Pre-assembled and surveyed at Contractor facility top part transported as a whole to CERN lowered down the shaft 12/31/2018 Sebastian Bachmann University of Heidelberg

20 University of Heidelberg
Installation Top view 12/31/2018 Sebastian Bachmann University of Heidelberg

21 University of Heidelberg
Schedule week 27/03: Drill holes on bunker week 03/04: Install and align table on bunker Install bunker extension side A week 10/04: Install cable guidance side A Install and align pillars week 17/04: Install bunker extension side C week 25/04: Install cable guidance side C week 02/05: Install bridge 12/31/2018 Sebastian Bachmann University of Heidelberg