Installation of the support structure for the LHCb inner and outer tracking system (IT & OT)
Sebastian Bachmann University of Heidelberg Henk Schuiljenburg NIKHEF 12/31/2018 Sebastian Bachmann University of Heidelberg
2
University of Heidelberg
Working site Position for the Outer Tracker 12/31/2018 Sebastian Bachmann University of Heidelberg
3
University of Heidelberg
Main elements A-site C-site support bridge C-frame OT cable guidance support IT bottom table cable guidance 12/31/2018 Sebastian Bachmann University of Heidelberg
4
University of Heidelberg
Installation steps Bunker extension A / drilling holes in bunker 2. Tables on bunker 3. Pillars on bunker and ext. A 4. Alignment of pillars 5. Cable guidance on ext. A 6. Bridge installation and alignment 7. Complete alignment 12/31/2018 Sebastian Bachmann University of Heidelberg
5
Install bunker extension A + drill holes in bunker
12/31/2018 Sebastian Bachmann University of Heidelberg
6
Install bottom tables on bunker
12/31/2018 Sebastian Bachmann University of Heidelberg
7
Install and allign pillars
12/31/2018 Sebastian Bachmann University of Heidelberg
8
University of Heidelberg
- Install cable extension side A - Install bunker extension side C - Install cable guidance side C 12/31/2018 Sebastian Bachmann University of Heidelberg
9
Bunker, bunker extension, tables and cable guidance
Pillars not drawn! 12/31/2018 Sebastian Bachmann University of Heidelberg
10
University of Heidelberg
12/31/2018 Sebastian Bachmann University of Heidelberg
11
University of Heidelberg
Insert bridge 12/31/2018 Sebastian Bachmann University of Heidelberg
12
University of Heidelberg
Insert C-frames for OT 12/31/2018 Sebastian Bachmann University of Heidelberg
13
Installation of IT support
12/31/2018 Sebastian Bachmann University of Heidelberg
14
University of Heidelberg
Beam pipe in place 12/31/2018 Sebastian Bachmann University of Heidelberg
15
Installation of C-frames and IT support (A-site)
12/31/2018 Sebastian Bachmann University of Heidelberg
16
University of Heidelberg
Delivery of materials Bridge: Ready for shipment, delivery april, 4th or 5th Storage outside possible (stainless steel) Bottom table and cable guidance Storage in the cavern 12/31/2018 Sebastian Bachmann University of Heidelberg
17
University of Heidelberg
Support table 12/31/2018 Sebastian Bachmann University of Heidelberg
18
University of Heidelberg
Support bridge Long pillars (6m) 12/31/2018 Sebastian Bachmann University of Heidelberg
19
University of Heidelberg
Down the shaft Pre-assembled and surveyed at Contractor facility top part transported as a whole to CERN lowered down the shaft 12/31/2018 Sebastian Bachmann University of Heidelberg
20
University of Heidelberg
Installation Top view 12/31/2018 Sebastian Bachmann University of Heidelberg
21
University of Heidelberg
Schedule week 27/03: Drill holes on bunker week 03/04: Install and align table on bunker Install bunker extension side A week 10/04: Install cable guidance side A Install and align pillars week 17/04: Install bunker extension side C week 25/04: Install cable guidance side C week 02/05: Install bridge 12/31/2018 Sebastian Bachmann University of Heidelberg