Download presentation
Presentation is loading. Please wait.
1
SW 6th Ave. – Fairlawn to Gage
Roadway improvements with asphalt pavement, curb & gutter, and 5’ sidewalk & ’ side-path with storm sewer, which will eliminate most ditches Roadway widening from 2-lanes to 3-lanes (2 thru lanes with a turning lane) Pedestrian crossing with flasher to be installed at 6th & Westchester Rd. Pedestrian crossing installed at Chalet Apartments with bus stops Trafficway improvement funded by a General Obligation Bond issue Utility relocation beginning in the Spring of 2017 Project Contacts: City of Topeka Jeff Hunt, P.E. Brian Faust, P.E. Brian Armstrong, P.E. Bartlett & West Jeff Lolley, P.E.
2
Construction – 2017 & 2018 2017 Proposed Construction
Phase I – 6th Ave. closed from Schendel east to Westchester Rd. Phase II – 6th Ave. closed from Fairlawn to Schendel Estimated timeframe – 6 months 2018 Proposed Construction Phase III – 6th Ave. closed from Westchester Rd. east to Chalet Apartments Phase IV – 6th Ave. closed from Chalet Apts. to Gage Estimated timeframe – 8 months
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.