Presentation is loading. Please wait.

Presentation is loading. Please wait.

Plumbing Systems CNST 305 Environmental Systems 1 Dr. Berryman

Similar presentations


Presentation on theme: "Plumbing Systems CNST 305 Environmental Systems 1 Dr. Berryman"— Presentation transcript:

1 Plumbing Systems CNST 305 Environmental Systems 1 Dr. Berryman
Water Sizing Plumbing Systems CNST 305 Environmental Systems 1 Dr. Berryman 3c Water System Chapter 8; Appendix B (Wentz) and 8.1-  8.3 (Toa) 4.11 Analysis and Design of Construction Systems - Mechanical (6 hrs)

2 Steps to sizing

3 Isometric Diagram 30o

4 Assign WSFU Water Supply Fixture Unit (WSFU)
2 WSFU x .75 = 1.5 5 WSFU Assign WSFU 10 WSFU 1 ¼” spud Water Supply Fixture Unit (WSFU) Use Table 2-2 (Wentz) for WSFU assignment…pp 7-12 See note 3 (fine print on bottom)

5 Add Up All WSFU 110 WSFU 21 WSFU 3 WSFU 1.5 WSFU 1.5 WSFU 8 WSFU

6 Convert to GPM Hunter Curves Predominantly Flushometer
Predominantly Flush Tank Convert to GPM 5 GPM 3.5 GPM for each 10 GPM 29.4 GPM 36.8 GPM 42.7 GPM 78.3 GPM 70 GPM 7 GPM 27 GPM 5 GPM 14.6 GPM 16.4 GPM

7 Select Chart and Size ½” ¾” Note: Use copper pipe
1” 1 ¼” spud Note: Use copper pipe Use minimum size from tbl 2.2 for individual fixture pipe

8 Predominantly Flushometers for Smooth Copper Pipe
42.7 gpm 29.4 gpm 36.8 gpm 70 gpm 78.3 gpm 2 ½” 2” 2” 1½” 1½” 5 gpm 10 gpm 1” ¾” Notes: 5-10 fps 2-7 psi/100’

9 Class Exercise You size the hot water piping
Does the hot water side use flushometers? Use predominately flush tanks

10 Check 5-10 fps 2-7 psi/100’ Pressure at last fixture 1” ½” ¾” 1 ½” 2”
1 ¼” ¾” 1” 1 ½” 2” 2 ½” ½”

11 Notable notes: Booster pumps
Need for boost water pressure to overcome static head and friction Sizing (A) Available water pressure (B) Pressure required at last fixture (C) Static head losses (D) Friction losses Equivalent length Pressure drop through backflow preventors, meter, water softeners, and filters A – (B+C+D) = required boost

12 Chapter 2,5,6 Appendix C (Wentz) and 8.4 - 8.5 (Toa)
Next Time Assignment #1 Due Monday beginning of class Problem 9 in Chapter 8 of Wentz, pp. 132 Drain Waste Vents (DWV) 4abc Drain, Waste, Vent Chapter 2,5,6 Appendix C (Wentz) and  (Toa)   


Download ppt "Plumbing Systems CNST 305 Environmental Systems 1 Dr. Berryman"

Similar presentations


Ads by Google