16th annual regulatory update conference November 17, 2017

Similar presentations


Presentation on theme: "16th annual regulatory update conference November 17, 2017"— Presentation transcript:

1 16th annual regulatory update conference November 17, 2017
Air permitting 16th annual regulatory update conference November 17, 2017 Mike Adhanom, Section Chief, Division of Air Quality

2 New General Permits (GPs/GOPs)
GP-017A Boiler(s) and/or Heater(s) Each Less Than 5 MMBTU/hr GP Available since March 20, 2017 GP-018A Boiler(s) and/or Heater(s) Each greater than or equal to 5 MMBTU/hr and Less Than 10 MMBTU/hr; and GP Available since August 07, 2017 GOP-008 Boiler or Heater greater than or equal to 5 MMBTU/hr Less Than 10 MMBTU/hr; GOP Available since August 07, 2017 PDF approvals - GPs and GOPs registration submittals and approvals PDFs

3 GPs and GOPs under construction
GP-016A and GOP-002A - Manufacturing and Materials Handling Equipment (Former SEGAP) Replacing: SEGAP (GP-016 and GOP-002A) Confined Abrasive Blasting Equipment (GP-002) Woodworking Equipment (GP-003) Availability Date : December 04, 2017 GP-004B - Fuel Dispensing Facilities equipped with Phase I (Stage I) Rule change (N.J.A.C.7: ) Public Comments: November 6, 2017 Availability Date : January, 2018

4 GPs and GOPs under construction
GP-009B - Boiler(s) and/or Heater(s) Each greater than or equal to 10 MMBTU/hr and Less Than 50 MMBTU/hr; AND GOP Boiler or Heater greater than or equal to 10 MMBTU/hr Less Than 50 MMBTU/hr; GP-015A – Plating Operations Federal Rule Change (40CFR63 Subpart 6’Ws)

5 HELP LINES General Permits (609) 633-2829
Operating Permits (609) Pre-Construction (609) RADIUS (609)


Download ppt "16th annual regulatory update conference November 17, 2017"