Download presentation
Presentation is loading. Please wait.
1
802.11 Task Group ac Process Overview
January 2009 doc.: IEEE /86r0 January 2009 Task Group ac Process Overview Date: Authors: Darwin Engwer, Nortel Networks Darwin Engwer, Nortel Networks
2
Abstract An overview of the TGac task group process. January 2009
doc.: IEEE /86r0 January 2009 Abstract An overview of the TGac task group process. Darwin Engwer, Nortel Networks Darwin Engwer, Nortel Networks
3
TGac Overview Objectives Constraints Guiding Documents
January 2009 TGac Overview Objectives Constraints Guiding Documents Specification Framework Element Candidates Darwin Engwer, Nortel Networks
4
January 2009 TGac Objectives Darwin Engwer, Nortel Networks
5
January 2009 TGac Constraints Darwin Engwer, Nortel Networks
6
802.11 TGac Guiding Documents
January 2009 TGac Guiding Documents Darwin Engwer, Nortel Networks
7
Specification Framework Element Candidates
January 2009 Specification Framework Element Candidates Darwin Engwer, Nortel Networks
8
References 11-08-1395-00-00ac-Task-Group-Process-Overview.ppt
January 2009 References ac-Task-Group-Process-Overview.ppt vht-inputs-for-a-vht-selection-procedure.ppt vht-september-report.ppt vht-towards-an-improved-proposal-development-process-for-vht.ppt vht-below-6-ghz-par-nescom-form-plus-5cs.doc Darwin Engwer, Nortel Networks
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.