The Reverse Osmosis Seawater Desalination CONTAINER CONCEPT present
2
Containerized The Energy Efficient – Low Maintenance
3
Reverse Osmosis Seawater Desalination Plants
4
Containerized SWRO The Containerized Solution
5
- takes the expenses and mystery out of seawater RO Desalination and brings it DOWN-TO-EARTH - by making pre-designed module sized plants, fully assembled in standard 20-ft and 40-ft containers and install them right where the potable water is needed. THE CONTAINER CONCEPT
6
No need for expensive buildings No time consuming and costly civil works No advanced calculations and projecting procedures - but reduced costs -due to an extremely short installation, commissioning and training schedule of only 1 week – compared to a 3-4 month installation time for a conventional NON containerized plant. THIS MEANS:
7
– inside the container, fully tested before shipping, ready to produce high-quality potable water within days of delivery. All what the clients need to do is to arrange for the Seawater supply and the Electricity, and a foundation for the container Its all there:
8
The Container Concept includes: for clean seawater from beach wellfor seawater requiring pre filtration 250m³/day – One (1) 20-ft container 300m³/day – One (1) 20-ft container 500m³/day – One (1) 40-ft container 1000m³/day – One (1) 40-ft container 250m³/day – One (1) 40-ft container 300m³/day – One (1) 40-ft container 500m³/day – Two (2) 40-ft containers 1000m³/day – Two (2) 40-ft containers - and as the example on the following page
9
A 300 m³/day plant like this! Installed in a 20-ft container Produce all the potable water requirements for this resort
10
Installation Procedure: The following is a presentation of the installation of a HOH Standard Containerized SWRO Desalination Plant, with a capacity of 300m³/day, producing potable water with a TDS of less than 500 ppm, as recommended by the WHO (World Health Organization). The feed water source is clean seawater from a seawater well with a TDS of 36,000 ppm.
11
The Playa Roca Resort, Lanzarote, Canary Islands, Spain where the installation took place - Aug.11, 2003
12
Installation site prepared by local contractor with power supply and connection pipes to feed water well, product water reservoir and brine disposal injection well.
13
The 300 m³/day plant fully assembled in 20-ft container arrives at Resort at 8:00 AM
14
A local crane contractor prepare to remove the containerized plant from the truck - 8:15 AM
15
Crane contractor moving the containerized plant from the truck towards it's permanent location – 9:00AM
16
Plant at installation site – 9:15 AM
17
- and lowered into position – 9:25 AM
18
Containerized plant at permanent location - 9:50 AM
19
- ready for the HOH technician to commission and to perform training of the local operator and maintenance technicians
20
Close-up view of the plant with a capacity of 300 m³/day producing high quality potable water at $0.70/m³
21
Inside view of 250 m³/day containerized plant installed at another Island Resort
22
Inside view of 300 m³/day containerized plant installed at International Hotel & Beach Resort, Spain
23
Thank you for viewing this presentation of the HOH Container Concept - and our Containerized SWRO Plants For additional information, please visit our website www.HOHUSA.net Phone: 706 694 8869 – Facsimile: 706 694 4124 - Email: info@HOHUSA.net Gunnar A. Axelsen, President Contact: