Peco Facet Sewage Water Treatment Plant

Similar presentations


Presentation on theme: "Peco Facet Sewage Water Treatment Plant"— Presentation transcript:

1 Peco Facet Sewage Water Treatment Plant
STP 16 HA

2 Peco Facet Sewage Water Treatment Plant
Project Information Project: …………………………………………….…..Lankaran Court of Grave Crimes Contractor:……………………………… Ministry of Justice of Azerbaijan Republic Detailed design …………………….... “AzerDovletLayihe” State Design Institute Civil works: ……………………………………………………….… “EL-SEYM Insaat” LLC Subcontractor for Sewage Water Treatment: …………..Facet Germany GmbH Date of order: ………………………………………………………………………….July 2011 Facet model: …………………………………………………………………………..STP-16HA Max. design flow rate: …………………………………………………………….40 m³/day Equivalent inhabitants: ……………. 160 persons (Directive: CE 91/271/CEE) Commissioning date: ……………………………………………………………

3 Peco Facet Sewage Water Treatment Plant
Lankaran City R Republic of Azerbaijan 270 kilometers from capital Baku Lankaran

4 Lankaran Court of Grave Crimes Lankaran, Republic of Azerbaijan
Peco Facet Sewage Water Treatment Plant Lankaran Court of Grave Crimes Lankaran, Republic of Azerbaijan Facet STP unit

5 Peco Facet Sewage Water Treatment Plant
Waste Waters formed in toilets and kitchen to the Sewage Water Treatment Plant installed by Facet Facet STP unit The unit has been build behind the Court walls

6 Sewage Water Treatment Plant STP16HA
Peco Facet Sewage Water Treatment Plant Sewage Water Treatment Plant STP16HA Facet scope: Basic Design, Engineering, Supply of Equipment, Installation and Start-up All civil works and sewer network system was made by EL-SEYM Insaat LLC (local construction company)

7 Construction period – January 2012
Peco Facet Sewage Water Treatment Plant Construction period – January 2012 Pumper well Aeration Chamber Aeration chamber & control room Place for Module Control room General View EL-Seym Insaat LLC - Local Civil company has built Pumper well, Inlet pit, Aeration Chamber and Control Cabin According to drawings provided by Facet

8 Installation period – March 2012
Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Installation of Settling and Disinfection Chamber by Crane Installation works has been carried out by sub-contractor of FACET GERMANY

9 Installation period – March 2012
Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Installation of the skid to Control Room (PLC, Blower, Recirculation Pump, Ozone Generator)

10 Installation period – March 2012
Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Connections from Control Skid to the Module

11 Installation period – March 2012
Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Connections between Aeration Chamber and Settling/Desinfection Module

12 Installation period – March 2012
Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Installation of BioFilm Media and Air Diffuser in Aeration Chamber

13 Installation period – March 2012
Peco Facet Sewage Water Treatment Plant Installation period – March 2012 Basket in pumper well Outlet Pipe to Collection box

14 Peco Facet Sewage Water Treatment Plant
Water Filling – May 2012

15 Start up Commissioning – May 2012
Peco Facet Sewage Water Treatment Plant Start up Commissioning – May 2012 Facet specialists has carried out the operation training course to the staff of EL-Seym Insaat LLC

16 Start up Commissioning – May 2012
Peco Facet Sewage Water Treatment Plant Start up Commissioning – May 2012 Facet specialists has carried out the operation training course to the staff of EL-Seym Insaat LLC

17 Peco Facet Sewage Water Treatment Plant
General Plan

18 Peco Facet Sewage Water Treatment Plant
Effluent Conditions Ph……………………………………………………6-8 BOD5 ……………………………………………..<25 mg/l COD …..……………………………………………<125 mg/l TSS …………………………………………………<35 mg/l O2 dissolved (aeration chamber) …… mg/l Temperature ………………………………….. Ambient Aspect ………………………………………..…. Odorless and Transparent

19 Thank you for attention
Peco Facet Sewage Water Treatment Plant Thank you for attention