Presentation is loading. Please wait.

Presentation is loading. Please wait.

Charles R. Wright charles_wright@azimuthsystems.com May 2004 Wireless Performance Prediction Study Group WG Report and Meeting Slides Charles R. Wright.

Similar presentations


Presentation on theme: "Charles R. Wright charles_wright@azimuthsystems.com May 2004 Wireless Performance Prediction Study Group WG Report and Meeting Slides Charles R. Wright."— Presentation transcript:

1 Charles R. Wright charles_wright@azimuthsystems.com
May 2004 Wireless Performance Prediction Study Group WG Report and Meeting Slides Charles R. Wright C. Wright, Azimuth Systems

2 Wireless Performance Prediction Study Group WG Report
May 2004 Wireless Performance Prediction Study Group WG Report (2 slides) C. Wright, Azimuth Systems

3 WPP Report Total meeting time: 10 hours Total number of attendees: 33
May 2004 WPP Report Total meeting time: 10 hours Total number of attendees: 33 Goal Wordsmith PAR & 5 Criteria SG approval – success! Several motions to be brought before WG C. Wright, Azimuth Systems

4 Next Steps WG approval of PAR/5Crit and forwarding to 802 EXCOM
May 2004 Next Steps WG approval of PAR/5Crit and forwarding to 802 EXCOM Empowered to hold weekly telecons until July meeting Thursdays 12 noon ET Will announce as necessary C. Wright, Azimuth Systems

5 May 2004 WG Motions C. Wright, Azimuth Systems

6 May 2004 Motion to Approve PAR Believing the PAR & 5 Criteria contained in the documents below meet IEEE-SA guidelines, Request that this PAR & 5 Criteria contained in 11-04/613r2 & 11-04/585r5 be posted to the ExCom agenda for WG 802 preview and ExCom approval (and subsequent submission to NesCom). Movers: WPP SG: Green/Lanzl Result: WG: mover/seconder Result: x-x-x C. Wright, Azimuth Systems

7 Motion to Affirm PAR by LB
May 2004 Motion to Affirm PAR by LB Move to have the WG chair initiate a 15 day letter ballot to reaffirm the WG decision regarding the WPP PAR and 5 Criteria Movers: WPP SG: Lanzl/Green Result: WG: mover/seconder Result: x-x-x C. Wright, Azimuth Systems

8 Motion to Empower to resolve comments
May 2004 Motion to Empower to resolve comments Move to empower the WPP SG to hold special meetings as needed during the week beginning June 7 to resolve comments received from the reaffirmation letter ballot. Such meetings will be held by teleconference. Movers: WPP SG: Green/Amer Result: WG: mover/seconder Result: x-x-x C. Wright, Azimuth Systems

9 Welcome to Wireless Performance Prediction
May 2004 Welcome to Wireless Performance Prediction Charles R. Wright C. Wright, Azimuth Systems

10 May 2004 Meeting Tone PLEASE Bring your Engineer Mentality and Technologist Attitude Please keep a Positive Attitude Please check your Ego and Politics at the door. We try hard to follow the process - not because we like process, but because enables us to conduct our meetings in a fair and efficient manner Try hard to understand another member’s viewpoint. Try especially hard to “hear” what they are not saying. Many disagreements arise from such unspoken assumptions. –Jon Rosdahl former HTSG Chair C. Wright, Azimuth Systems

11 Review IEEE/802 & 802.11 Policies and Rules
May 2004 Review IEEE/802 & Policies and Rules Study Group: Everyone Votes. All 802 policies apply All policies apply Submissions must meet document format criteria. All Study Group voting requires 75% consensus. C. Wright, Azimuth Systems

12 IEEE-SA Standards Board Bylaws on Patents in Standards
May 2004 IEEE-SA Standards Board Bylaws on Patents in Standards 6. Patents IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard. This assurance shall be provided without coercion and prior to approval of the standard (or reaffirmation when a patent becomes known after initial approval of the standard). This assurance shall be a letter that is in the form of either a) A general disclaimer to the effect that the patentee will not enforce any of its present or future patent(s) whose use would be required to implement the proposed IEEE standard against any person or entity using the patent(s) to comply with the standard or b) A statement that a license will be made available without compensation or under reasonable rates, with reasonable terms and conditions that are demonstrably free of any unfair discrimination This assurance shall apply, at a minimum, from the date of the standard's approval to the date of the standard's withdrawal and is irrevocable during that period. Approved by IEEE-SA Standards Board – December 2002 C. Wright, Azimuth Systems

13 Inappropriate Topics for IEEE WG/TG/SG Meetings
May 2004 Inappropriate Topics for IEEE WG/TG/SG Meetings Don’t discuss licensing terms or conditions Don’t discuss product pricing, territorial restrictions or market share Don’t discuss ongoing litigation or threatened litigation Don’t be silent if inappropriate topics are discussed… do formally object. If you have questions, contact the IEEE Patent Committee Administrator at Approved by IEEE-SA Standards Board – December 2002 C. Wright, Azimuth Systems

14 Study Group Attendance
May 2004 Study Group Attendance Attendance must be taken in study groups 802 rules Please sign in to the sheet being passed around Don’t need contact info, don’t need time when attended Just sign the sheet once during the week Thank you! C. Wright, Azimuth Systems

15 A Friendly Reminder… Don’t forget to log your attendance!
May 2004 A Friendly Reminder… Don’t forget to log your attendance! Attendance server problems? Talk to Harry Worstell C. Wright, Azimuth Systems

16 Progress since Orlando
May 2004 Progress since Orlando Held six teleconferences Formed two ad hoc groups to focus on Metrics and methodologies (Paul Canaan, Intel) Prediction (Roger Skidmore, Wireless Valley) Ad hoc groups considered Presentations/notes 11-04/441r0, “Overview of Prediction of Wireless Communication Network Performance,” Roger Skidmore 11-04/475r0, Prediction Ad Hoc Teleconference Notes, Roger Skidmore 11-04/450r0, 11-04/462r0, “Wireless Performance Prediction – Methodology Ad-Hoc Working Group,” Paul Canaan 11-02/491r0, “WPP Summary of Developed Text,” Charles Wright PAR proposal 11-04/492r0, r1, “Possible PAR for IEEE Wireless Performance Prediction,” Charles Wright C. Wright, Azimuth Systems

17 Timeline Going Forward
May 2004 Timeline Going Forward March meeting “Big picture” (vision) discussion of WPP Discuss scope and purpose for PAR May meeting Detailed crafting of PAR, 5 Criteria Move to have PAR/5 Criteria approved by WG for forwarding to EXCOM July meeting SG resolution of comments from EXCOM, 802 Vote to extend life of SG to do the work of the TG (for reaffirmation in TG) We are here C. Wright, Azimuth Systems

18 Call for Presentations germane to Scope and Purpose of WPP
May 2004 Call for Presentations germane to Scope and Purpose of WPP Draft PAR, Larry Green, doc # 11-04/582r1 Draft 5 Criteria, Khaled Amer, doc # 11-04/585r1 C. Wright, Azimuth Systems

19 Straw Poll 1 Change the proposed scope in doc 11-04/492r2 to read:
May 2004 Straw Poll 1 Change the proposed scope in doc 11-04/492r2 to read: The scope of the project is to provide a set of metrics and measurement methodologies to enable measuring and predicting the performance of WLAN devices and networks at the component and application level in a test environment. (1) The scope of the project is to provide a set of metrics and measurement methodologies to enable measuring and predicting the performance of WLAN devices and networks at the component and application level. (7) The scope of the project is to provide a set of metrics, measurement methodologies and test conditions to enable measuring and predicting the performance of WLAN devices and networks at the component and application level. (10) Can vote for more than one C. Wright, Azimuth Systems

20 Straw Poll 2 Change the proposed scope in doc 11-04/492r2 to read:
May 2004 Straw Poll 2 Change the proposed scope in doc 11-04/492r2 to read: The scope of the project is to provide a set of metrics and measurement methodologies to enable measuring and predicting the performance of WLAN devices and networks at the component and application level. (0) The scope of the project is to provide a set of metrics, measurement methodologies and test conditions to enable measuring and predicting the performance of WLAN devices and networks at the component and application level. (12) Vote for only one C. Wright, Azimuth Systems

21 Milestones before becoming TG
May 2004 Milestones before becoming TG 27 Days 30 Days This Mtg. 15 Day Letter Ballot 802 Plenary Portland closing plenary: Friday, May 14 Deadline for getting on EXCOM agenda: June 11 Start of 802 EXCOM meeting: July 12 Conclusion: we have just enough time to conduct the LB C. Wright, Azimuth Systems

22 May 2004 Motion #1 Move to approve following document as the Five Criteria for the WPP SG: 11-04/585r5, “Five Criteria for IEEE Wireless Performance Prediction” Mover/Seconder: Amer/Green Votes (all SG attendees, 75% to pass) Yes:13 No:0 Abs:0 C. Wright, Azimuth Systems

23 May 2004 Motion #2 Move to approve following documents as the PAR for the WPP SG: 11-04/613r2, “Draft PAR for Wireless Performance Prediction” Mover/Seconder: Green/Alexander Votes (all SG attendees, 75% to pass) Yes:11 No:0 Abs:0 C. Wright, Azimuth Systems

24 May 2004 Motion #3 Move to request the chair to forward following documents as the PAR and 5 Criteria to the Working Group: 11-04/613r2, “Draft PAR for Wireless Performance Prediction” 11-04/585r5, “Five Criteria for IEEE Wireless Performance Prediction” Mover/Seconder: Green/Lanzl Votes (all SG attendees, 75% to pass) Yes:12 No:0 Abs:0 C. Wright, Azimuth Systems

25 May 2004 Motion #4 Move to request the WPP chair to request the WG chair initiate a 15-day letter ballot reaffirming the WG decision regarding the WPP PAR and 5 Criteria Mover/Seconder: Lanzl/Green Votes (all SG attendees, 75% to pass) Yes:12 No:0 Abs:0 C. Wright, Azimuth Systems

26 May 2004 Motion #5 Move to request empowerment for the WPP SG to hold special meetings as needed during the week beginning May 31 to resolve comments received from the reaffirmation letter ballot. Such meetings will be held by teleconference. Mover/Seconder: Green/Amer Votes (all SG attendees, 75% to pass) Yes: 14 No:0 Abs:0 C. Wright, Azimuth Systems

27 May 2004 WPP Document List C. Wright, Azimuth Systems

28 Docs related to Telecons (25 Mar 04 to 6 May 04)
Presentations Minutes C. Wright, Azimuth Systems

29 Docs related to Telecons (19 Feb 04 to 11 Mar 04)
May 2004 Docs related to Telecons (19 Feb 04 to 11 Mar 04) Agendas wpp-telecon-agenda-19-feb-04.ppt wpp-telecon-agenda-26-feb-04.ppt Presentations wpp-wireless-performance-prediction-organization-proposal.ppt wpp-wireless-performance-prediction-proposed-framework.ppt Minutes wpp-wpp-sg-telecon-minutes-feb doc wpp-telecon-minutes-26-feb-2004.doc wpp-wpp-sg-telecon-minutes-mar doc wpp-wpp-sg-telecon-minutes-mar doc C. Wright, Azimuth Systems

30 Jan 2004 802.11 Meeting (Vancouver) Presentations
May 2004 Jan Meeting (Vancouver) Presentations wpp-ieee study-group-overview-2004.ppt wpp-wpp-project-background-&-roadmap.ppt wpp-optimization-parallels-with-cdma-cellular-pcs-industry.ppt wpp-ctia-over-air-test-standard.ppt wng-wpp-approaches-to-issue.ppt wng-wpp-user-experience.ppt C. Wright, Azimuth Systems

31 Nov 2003 802.11 (Albuquerque) Presentations
May 2004 Nov (Albuquerque) Presentations Presented within the Wireless Next Generation standing committee wng-wpp-introduction-&-overview.ppt wng-wpp-approaches-to-issue.ppt wng-wpp-summary-work-plan-&-proposal.ppt wng-wpp-user-experience.ppt wng-wpp-simulating-field-performance.ppt wng-rf-performance-testing.ppt C. Wright, Azimuth Systems

32 Early WPP Telecon Presentations
May 2004 Early WPP Telecon Presentations These presentations were made prior to the formation of the WPP SG, and can be found on EMC Society WPP web site, maintained by S. Berger: Factors Affecting Performance, F. Mlinarsky Standard Methods for Predicting Wireless Performance, P. Canaan, P. Ellis CTIA Standard for Over-The-Air Testing of Wireless Devices and Field Map Movies, M. Foegelle RDI's Approach to Performance Prediction, K. Britain Azimuth Test Configuration, F. Mlinarsky Test Methodology, F. Mlinarsky C. Wright, Azimuth Systems

33 May 2004 Backup Information C. Wright, Azimuth Systems

34 Teleconference Info Date: Thursdays Time: 11 AM Eastern time (1600 UT)
May 2004 Teleconference Info Date: Thursdays Time: 11 AM Eastern time (1600 UT) Duration: 1 hour Phone #  International: Passcode: Next: March 25, 2004 C. Wright, Azimuth Systems

35 Email Reflector Original reflector: stds-wpp@ieee.org
May 2004 Reflector Original reflector: Set up under aegis of EMC Society reflector: Requires membership to send to it Can be monitored through web site rules require all SG communication to be through reflector Use of WPP reflector will be discontinued after March meeting C. Wright, Azimuth Systems

36 References for 802.11 Newcomers (1 of 2)
May 2004 References for Newcomers (1 of 2) Web site: Document server: Sign up for an account No need to be an member to get an account Once logged in, “join” : Click on “ WLAN WG” on left In center window, choose to become a new member Click again on “ WLAN WG” An additional subitem called “Documents” will be revealed – click on it You’ve reached the document server! C. Wright, Azimuth Systems

37 References for 802.11 Newcomers (2 of 2)
May 2004 References for Newcomers (2 of 2) Document numbering scheme WG-YY-NNNN-RR-gggg-English-document-title.ext WG = 802 working group number, e.g. “11” as in YY = two digits of year NNNN = document number RR = document revision number gggg = group to which the document pertains Example: wpp-telecon-agenda-19-feb-04.ppt C. Wright, Azimuth Systems


Download ppt "Charles R. Wright charles_wright@azimuthsystems.com May 2004 Wireless Performance Prediction Study Group WG Report and Meeting Slides Charles R. Wright."

Similar presentations


Ads by Google