Download presentation
Presentation is loading. Please wait.
1
Shell UK Exploration and Production
Monday 12 November 2001 Sub-Sea Gas-Lift Session 1. Chevron’s design philosophy (Ken Decker) 2. Equipment for GL in deepwater (Roger Stinson) 3. Reducing well-test deferments (Philip Holweg) 4. GL as back-up of ESP lifted wells (Eric Lovie/ Philip Holweg) Sub-Sea GL Panel Session (Wim der Kinderen) Shell UK Exploration and Production
2
Shell UK Exploration and Production
How can we eliminate or alleviate limitations of sub-sea gas-lift ? Shell UK Exploration and Production
3
Shell UK Exploration and Production
Subsea Gas-Lift Issues Expensive well entries Compromised lift depth Compromised injection port size Gas-lift optimisation is difficult but critical Limited or no survey and well test data available Subsea GL flowmeters are unreliable GL flow control is effectively choke position control Unloading valve failures are difficult to identify Cold lift gas may cause hydrate problems Leaking check valves jeopardise well integrity Shell UK Exploration and Production
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.