OnBase Training Speaker: Dora Compis Disaster Recovery
2
What would cause Disaster Recovery (DR) situation ?
Any number of things could cause your company to need to fail over to DR. Our goal at PF is to get you back on line as fast as possible with minimal intervention needed from PF. Most DR situations typically make communications difficult so this needs to be considered.
3
Different Levels of DR to consider:
Disaster Recovery Different Levels of DR to consider: A single server crash (database server, web server, etc) Branch location failure Server room electrical outage Server complex fire/hurricane/flood How critical is OnBase, INFO-ACCESS, etc. For each level of outage, what is the required deadline to have the system operational?
4
Lets talk about what you are doing today
Disaster Recovery Lets talk about what you are doing today
5
Think in terms of the operations center is gone!
Disaster Recovery Think in terms of the operations center is gone! Where are your backup tapes? Do you know what is being backed up? Where will we restore the tapes? How quickly can we get replacement servers? How do we receive files from our Host? How do we COLD process? What about Host Sync / Dataloader? Do we have an alternate location? Does the alternate location have sufficient power to handle many servers? Does the alternate location have a high speed internet connection to allow our people remote access to work from home?
6
What do you have, where do you need to be?
Disaster Recovery What do you have, where do you need to be? Tape backups? OnBase CD/DVD archives? Mirroring? Copy to DR site? Internet backup solution? Database dumps?
7
Failing over to DR Disaster Recovery
Server name change vs DNS entry changes Workstation ODBC changes HostSync/Dataloader files – when can they be transferred to DR site COLD – will reports go to new server; will someone need to be notified to make a change. Scan workstation changes? Published failover plan/steps
8
PF is here to help! Disaster Recovery
Work with you to develop a DR plan Help write Fail to DR documentation Setup DR system Testing – Please give us 2 or 3 weeks notice when you are going to be doing a DR test in case you need assistance. Most customers are able to perform the DR testing during the work week.