Presentation is loading. Please wait.

Presentation is loading. Please wait.

The "D" NOTAM Effective Jan 28, 2008.

Similar presentations


Presentation on theme: "The "D" NOTAM Effective Jan 28, 2008."— Presentation transcript:

1 The "D" NOTAM Effective Jan 28, 2008

2 What is Going on with NOTAMs??
***Note: FDC NOTAMs will not change!!

3 New NOTAMs with Key Word
Current NOTAMs !IND 10/059 (KIND A0619/06) IND 5L ILS LLZ UNUSBL ROLLOUT GUIDANCE WEF New NOTAMs with Key Word !IND 10/059 (KIND A0619/06) IND NAV 5L ILS LLZ UNUSBL ROLLOUT GUIDANCE WEF

4 Key Words 1-5 (1) RWY (Runway) (2) TWY (Taxiway)) (3) RAMP (Ramp)
(4) APRON (Apron (5) AD (Aerodrome includes airport, heliport, and helipads)

5

6 More Examples Key Words1-5
(1) RWY (Runway) (2) TWY (Taxiway) (3) RAMP (Ramp) (4) APRON (Apron) (5) AD (Aerodrome includes airport, heliport, and helipads)

7 Key Words 6-8

8

9 More Examples Kew Words 6-8
(6) OBST (Obstructions, including obstruction lighting outages) (7) NAV (Navigation Aids) (8) COM (Communications)

10 Key Words 9-10 Hours Of Ops (Tower / Customs) Fuel Weather (AWOS / ASOS / ATIS) LLWAS Radar SVC NOTAMs will be published if one of the following has changed or not available

11

12 More Examples Kew Words 9-10
(9) SVC (Services) (10) AIRSPACE (Airspace)

13 Key Words 11-12

14 Examples Key Words 11-12 (11) (U) – Unverified Aeronautical Information (12) (O) – Other Aeronautical Information (11) (U) – Unverified Aeronautical Information (12) (O) – Other Aeronautical Information ** ** Note Any NOTAM associated with “Personnel and Equipment Working” (PAEW), will be associated with RWY, TWY, RAMP, or APRON and a direction from the associated movement area, as appropriate.

15 Where to find updates:


Download ppt "The "D" NOTAM Effective Jan 28, 2008."

Similar presentations


Ads by Google