Download presentation
Presentation is loading. Please wait.
Published byToralf Gulbrandsen Modified over 6 years ago
1
Mikael Andersson Senior Engineer Health physics
A BNFL Group company Mikael Andersson Senior Engineer Health physics 3rd EC/ISOE workshop, Portoroz, April 2002 2
2
A Swedish dose passport- contractors point of view
Introduction and purpose of the presentation Procedure for German dose passports The Swedish dose passport Licensing procedure for the Swedish dose passport Legal demands from German Authorities Summary and remarks Where do I come from My company BNFL/Westinghouse The speech is about a licensing procedure in Germany to use Swedish dose passports since we joined the EU in 1995
3
A Swedish dose passport- contractors point of view
1. Stockholm 2. Forsmark Power plants 3. Westinghouse Atom 4. Studsvik 5. Oskarshamn Power plants 6. Barsebäck Power plant 7. Ringhals Power plants
4
A Swedish dose passport- contractors point of view
Westinghouse Atom Nuclear Fuel Factory The concession for production of uranium dioxide powder (UO2) is 600 tonnes per year. We manufacture both BWR and PWR fuel. The approximate annual production of control rods is 200 rods.
5
A Swedish dose passport- contractors point of view
Westinghouse Atom Global Reactor Services division The Reactor services division provides field services for power stations all around the world. The personnel working here are strongly dependent on a correct recording of their personal doses.
6
A Swedish dose passport- contractors point of view
Purpose The purpose of this presentation is: - to describe the situation for our staff working as contractors in Germany on field service missions and - to inform about our licensing work with the Swedish dose passport in Germany
7
A Swedish dose passport- contractors point of view
Procedure for the use of German dose passports - German dose passports are used on field service missions in Germany. - Westinghouse Reaktor in Mannheim is the administrator of the German dose passports. Data needed for issuing a new dose passport: Dose excerpt from the Swedish dose registry, CDIS Witnessed copy of the persons passport Signed German dose passport
8
A Swedish dose passport- contractors point of view
Procedure for the use of German dose passports (cont.) The main reasons for the license application are: 1. Responsibility 2. Dose evaluation 3. Substantial cost savings 4. Minimised administration
9
A Swedish dose passport- contractors point of view
The Swedish dose passport - Issued by the SSI (Swedish Radiation Protection Institute) Data needed to issue a Swedish dose passport: Excerpt from the dose registry, CDIS Differences German Swedish Result of the health examination Not required Valid until filled with records 6 months Issued by Westinghouse Reaktor Issued by the competent authority, SSI
10
A Swedish dose passport- contractors point of view
11
A Swedish dose passport- contractors point of view
12
A Swedish dose passport- contractors point of view
Licensing procedure for the Swedish dose passport 1. Application according to 20§ Radiation Protection Ordinance 2. Declaration form for the person responsible for radiation protection 3. Letter from the SSI stating that Westinghouse Atom dosimetry service is compliant to the Swedish regulations 4. Excerpts from the criminal record for our managing director and the person responsible for radiation protection
13
A Swedish dose passport- contractors point of view
Licensing procedure for the Swedish dose passport (cont.) 5. Documents confirming the educational merits of the person responsible for radiation protection 6. Document stating the relationship between Westinghouse Reaktor and Westinghouse Atom The application was addressed to the competent authority LfU (Bayerisches Landesamt für Umweltschutz) in Munich.
14
A Swedish dose passport- contractors point of view
Legal demands on Westinghouse Atom as a contractor 1. Radiation protection agreement 2. Radiation protection instruction 3. The personnel have to be listed 4. Information demand on dose limits 5. The holder of the license shall: - measure dose with an approved TL-dosimeter - make sure that the listed workers carry the dosimeter provided by the installation - make sure that a whole-body measurement is performed
15
A Swedish dose passport- contractors point of view
Legal demands on Westinghouse Atom as a contractor (cont.) 6. Updating of the dose registry 7. Monthly dose reports to LfU 8. Swedish dose passports must be registered 9. Updating of the list of employees
16
A Swedish dose passport- contractors point of view
Summary - The license application has been processed but there are still some issues to deal with before the license can enter into force - The LfU has helped us in this process so hopefully it will be concluded in the near future - Finally: Could a European or even Global dose passport simplify or even prevent these situations from arising in the future?