Presentation is loading. Please wait.

Presentation is loading. Please wait.

TEC Services Status 30/12/2018 Nick Lumb.

Similar presentations


Presentation on theme: "TEC Services Status 30/12/2018 Nick Lumb."— Presentation transcript:

1 TEC Services Status 30/12/2018 Nick Lumb

2 Services Optical fiber ribbons Cooling loops
Read-out ribbon routing and lengths fixed from mockup study: tables with F. Vasey Control ribbons (small percentage of total) depend on choice for control loop scheme – see next talk Mechanics to hold MU connectors at prototype stage Cooling loops 316 stainless steel Flexible sections for connections to petals and beyond TEC Call for tender out: will receive prototype soon Multi-service cables and connectors 30/12/2018 Nick Lumb

3 General layout 30/12/2018 Nick Lumb

4 Routing to petals (1) 30/12/2018 Nick Lumb

5 Routing to petals (2) A 2 3 B 1 30/12/2018 Nick Lumb

6 Lengths A to B (mm) Disk Conn. 1 Conn. 2 Conn. 3 1 335 317 327 2 321
291 309 3 290 272 284 4 254 265 5 286 262 6 289 277 7 - 263 269 8 287 292 9 160 195 N.B. Table is for front petals 30/12/2018 Nick Lumb

7 MSC layout on cooling tubes
30/12/2018 Nick Lumb

8 Bulkhead: available space
12 and 6 o’clock: pixel services 3 and 9 o’clock: closed sectors for rigidity Available depth: 89mm 30/12/2018 Nick Lumb

9 Routing to PP1 30/12/2018 Nick Lumb

10 10°- 45° degree sector 30/12/2018 Nick Lumb

11 45°- 80° sector 30/12/2018 Nick Lumb

12 Interference with pixel services
30/12/2018 Nick Lumb

13 135°-170° sector (6x4) 30/12/2018 Nick Lumb

14 Space taken in Z 30/12/2018 Nick Lumb

15 Organisation of other services
30/12/2018 Nick Lumb

16 The MSC connector Robust connector for MSC at bulkhead and PP1
Compact encapsulation performed in industry (W. Karpinski) Width (male+fem.) = 45mm Thickness = 15mm Height = 85mm 30/12/2018 Nick Lumb

17 6 x 4 30/12/2018 Nick Lumb

18 Final scheme: 2 x 12! 30/12/2018 Nick Lumb

19 Conclusions Optical fiber lengths finalised
Awaiting prototype for cooling loops Routing worked out for cable paths from inside TEC to bulkhead connections (final cable lengths within 2 weeks) Optimal scheme for distribution of connectors at bulkhead determined 30/12/2018 Nick Lumb

20 Possible connection schemes
5 x 5 6 x 4 355 mm 310 mm 8 x 3 30/12/2018 Nick Lumb

21 Top view 5 x 5 6 x 4 65mm 8 x 3 30/12/2018 Nick Lumb


Download ppt "TEC Services Status 30/12/2018 Nick Lumb."

Similar presentations


Ads by Google