Presentation is loading. Please wait.

Presentation is loading. Please wait.

FY ‘14 AECOM Incident Prevention Model

Similar presentations


Presentation on theme: "FY ‘14 AECOM Incident Prevention Model"— Presentation transcript:

1 FY ‘14 AECOM Incident Prevention Model
TRIR LWCR LW Severity Rate WC Incurred Cost TNOL Auto Incidents Current Office Safety Plans in Effect -Current Project Safety Plans in effect Metric: % of plans in place versus target Compliance Auditing Metric: % of Audits conducted versus target Observations & Feedback loops: People-based safety program Near Misses Sr. Management Observations Metric: % of Observations completed versus target Metric: 1 Near Miss per 30,000 Manhours Incident Leading Metrics Lagging Metrics Metrics Factors for incident prevention (root causes) Outcomes Metrics Categories Trailing Indicators Systems Physical Conditions Behavior (Action) Culture, Perceptions, Beliefs Metric: Number of Observations vs. Goal


Download ppt "FY ‘14 AECOM Incident Prevention Model"

Similar presentations


Ads by Google