Presentation is loading. Please wait.

Presentation is loading. Please wait.

Trebuchet Calculations

Similar presentations


Presentation on theme: "Trebuchet Calculations"— Presentation transcript:

1 Trebuchet Calculations

2 Calculate the counterweights mass 
English lb. / 32.2 ft./s2 = 7.76 slugs  Calculate the mass of the projectile  English – 6lb /32.2 ft./s2 = .19 slugs

3 Calculate the torque on the counterweight
T = F x L English - 250lb x 4.5ft = 1125 lb.ft Calculate the torque of the projectile T= F x L English – 6lb x 8ft = 48 lb.ft

4 Calculate the potential energy of the counter weight
EP = w x h EP = m x g x h English EP = 250lb x 4.5ft = 1125 lb

5 Calculate the potential energy of the projectile
EP = w x h EP = w x g x h English EP = 6lb x 6.5ft = 39 lb

6 Calculate the velocity of the projectile
English v = d/t so v = ft./t so 32.8ft / 1.75 sec = ft./s Calculate the acceleration of the projectile English aave = vf – vi / t2 – t1 or a = ft./s – 0ft/s / 1.75s – 0s =10.71 ft./s

7 Calculate the kinetic energy of the pumpkin
English EK = ½ w/g v2 English ( .5 x (6lb / 32.2ft/s2)) x (18.74 ft./s)2 = lb

8 Calculate the efficiency of the trebuchet
Efficiency = Workout / Workin x 100% Work = T x Ɵ T= torque Ɵ = Angle moved through x radians English Workout = projectile torque x (degrees x rads) Workin = Counterweight torque x (degrees moved x rads) Wout = 48lb.ft x (60°x rads) = 50.4 lb.ft Win. = 1125lb.ft x (60° x rads) = lb.ft Eff = 50.4 lb.ft / lb.ft x 100% = 4.26%


Download ppt "Trebuchet Calculations"

Similar presentations


Ads by Google