1 Chapter 17 Job Order Costing Student Version
These slides should be viewed using the presentation mode (left click your mouse on the icon).

2 Describe cost accounting systems used by manufacturing businesses.
Learning Objective 1 Describe cost accounting systems used by manufacturing businesses.

3 Cost Accounting Systems Overview
LO 1 Cost Accounting Systems Overview A process cost system provides product costs for each manufacturing department or process. Process cost systems are often used by companies that manufacture units of a product that are indistinguishable from each other and are manufactured using a continuous production process. Examples: Oil refineries, paper producers, chemical processers, and food processors

4 Describe and illustrate a job order cost accounting system.
Learning Objective 2 Describe and illustrate a job order cost accounting system.

5 LO 2 Materials The materials account in the general ledger is a controlling account. A separate account for each type of material is maintained in a subsidiary materials ledger. The receiving report and the invoice are used to record the receipt of the merchandise and to control the payment for purchased items.

6 LO 2 Materials Legend Guitars A receiving report is prepared when materials that have been ordered are received and inspected. If there are no discrepancies, a journal entry is made to record the purchase.

7 LO 2 Materials The storeroom releases materials to use in manufacturing when a materials requisition is received. For direct materials, the quantities and amounts from the materials requisitions are posted to job cost sheets. Job cost sheets make up the work in process subsidiary ledger.

8 LO 2 Materials Legend Guitars A summary of the materials requisitions is used as a basis for the journal entry recording the materials used for the month.

9 LO 2 Factory Labor Legend Guitars A summary of the time tickets is used as the basis for the journal entry recording direct labor for the month.

10 LO 2 Factory Overhead Cost Factory overhead costs come from a variety of sources including the following: Indirect materials comes from a summary of materials requisitions. Indirect labor comes from the salaries of production supervisors and the wages of other employees such as janitors. Factory power comes with the utility bills. Factory depreciation comes from Accounting Department data.

11 LO 2 Factory Overhead Cost Legend Guitars Legend Guitars incurred $4,600 of overhead in December. The $500 of materials consisted of $200 of glue and $300 of sandpaper.

12 Allocating Factory Overhead
The process by which factory overhead or other costs are assigned to a cost object, such as a job, is called cost allocation. The factory overhead costs are allocated to jobs using a common measure related to each job. This measure is called an activity base, allocation base, or activity driver.

13 Predetermined Factory Overhead Rate
LO 2 Predetermined Factory Overhead Rate Factory overhead costs are normally allocated or applied to jobs using a predetermined factory overhead rate. The predetermined factory overhead rate is computed as follows: Predetermined Factory Overhead Rate Estimated Total Factory Overhead Costs Estimated Activity Base =

14 Predetermined Factory Overhead Rate
LO 2 Predetermined Factory Overhead Rate Legend Guitars Legend Guitars estimates the total factory overhead cost as $50,000 for the year and the activity base as 10,000 direct labor hours. Estimated Total Factory Overhead Costs Estimated Activity Base Predetermined Factory Overhead Rate = $50,000 10,000 direct labor hours Predetermined Factory Overhead Rate = = $5 per direct labor hour Predetermined Factory Overhead Rate

15 Applying Factory Overhead
LO 2 Applying Factory Overhead Legend Guitars Using a factory overhead rate of $5 per direct labor hour, $4,250 of factory overhead is applied as follows:

16 LO 2 Direct Labor Cost Legend Guitars During December, Legend Guitars spent $3,500 for direct labor on Job 71 and $7,500 on Job 72.

17 Applying Factory Overhead
LO 2 Applying Factory Overhead If the applied overhead is less than the actual overhead incurred, the debit balance is called underapplied factory overhead or underabsorbed factory overhead. If the applied overhead is more than the actual overhead incurred, the credit balance is called overapplied factory overhead or overabsorbed factory overhead.

18 Applying Factory Overhead
LO 2 Applying Factory Overhead Legend Guitars The factory overhead account for Legend Guitars shown below illustrates both underapplied and overapplied factory overhead.

19 Disposal of Factory Overhead Balance
Legend Guitars The journal entry to dispose of Legend Guitars’ December 31, 2012, underapplied overhead balance of $150 is as follows:

20 LO 2 Work in Process Legend Guitars During December, Job 71 was completed. Upon completion, the product costs are totaled. The job’s total cost of $10,250, divided by the 20 Jazz Series guitars produced as Job 71, provides a unit cost of $ Job 71 is transferred from production to finished goods inventory by the following entry:

21 Sales and Cost of Goods Sold
LO 2 Sales and Cost of Goods Sold Legend Guitars During December, Legend Guitars sold 40 Jazz Series guitars for $850 each, generating total sales of $34,000. Two entries are required, one for the sale and one to record the cost of goods sold and to reduce the Finished Goods account.

22 LO 2 Period Costs Period costs are used in generating revenue during the current period, but are not involved in the manufacturing process. They are recorded as either selling or administrative expenses. Selling expenses are incurred in marketing and delivering the product. Administrative expenses are incurred in managing the company, but are not related to the manufacturing or selling functions.

23 Summary of Cost Flows for Legend Guitars
Materials Factory Overhead Work in Process Dec. 1 6,500 Dec Dec ,000 (a) ,500 Materials Ledger Credit Accounts Payable, $10,500 No. 8 Wood—Maple Dec. 1 6,000 (a) 10,500 Glue Dec a. Materials purchased during December Sandpaper Dec

24 Summary of Cost Flows for Legend Guitars
Materials Factory Overhead Work in Process Dec. 1 6,500 Dec Dec ,000 (b) ,000 (a) ,500 (b) ,000 Materials Ledger Job Cost Sheets No. 8 Wood—Maple 20 Units of Jazz Series Guitars, Job 71 Dec. 1 3,000 Dec. 1 6,000 (b) 13,000 (a) 10,500 Glue Dec 60 Units of American Series Guitars, Job 72 Sandpaper b. Materials requisitioned to jobs Dec (continued)

25 Summary of Cost Flows for Legend Guitars
Materials Factory Overhead Work in Process Dec. 1 6,500 Dec Dec ,000 (b) ,000 (a) ,500 (b) ,000 Materials Ledger Job Cost Sheets No. 8 Wood—Maple 20 Units of Jazz Series Guitars, Job 71 Dec. 1 3,000 Dec. 1 6,000 (b) 13,000 (a) 10,500 (b) Direct materials 2,000 Glue Dec 60 Units of American Series Guitars, Job 72 (b) Direct materials 11,000 Sandpaper b. Update job cost sheets Dec (continued)

26 Summary of Cost Flows for Legend Guitars
Materials Factory Overhead Work in Process Dec. 1 6,500 Dec Dec ,000 (b) ,000 (a) ,500 (b) ,000 (c) 11,000 Materials Ledger Credit Wages Payable, $11,000 No. 8 Wood—Maple Dec. 1 6,000 (b) 13,000 (a) 10,500 Glue Dec c. Factory labor used in production of jobs Sandpaper Dec (continued)

27 Summary of Cost Flows for Legend Guitars
Materials Factory Overhead Work in Process Dec. 1 6,500 Dec Dec ,000 (b) ,000 (a) ,500 (b) ,000 (c) 11,000 Materials Ledger Job Cost Sheets No. 8 Wood—Maple 20 Units of Jazz Series Guitars, Job 71 Dec. 1 3,000 (b) Direct materials 2,000 Dec. 1 6,000 (b) 13,000 (a) 10,500 (c) Direct labor 3,500 Glue Dec 60 Units of American Series Guitars, Job 72 (b) Direct materials 11,000 (c) Direct labor 7,500 Sandpaper Dec c. Update the job cost sheets (continued)

28 Summary of Cost Flows for Legend Guitars
Materials Factory Overhead Work in Process Dec. 1 6,500 Dec Dec ,000 (b) ,000 (d) 500 (a) ,500 (d) 500 (b) ,000 (c) 11,000 Materials Ledger No. 8 Wood—Maple Dec. 1 6,000 (b) 13,000 (a) 10,500 d. Factory overhead incurred in production (indirect materials used, $500) Glue Dec Sandpaper Dec (continued)

29 Summary of Cost Flows for Legend Guitars
Materials Factory Overhead Work in Process Dec. 1 6,500 Dec Dec ,000 (b) ,000 (d) 500 (a) ,500 (d) 500 (d) 900 (b) ,000 (c) 11,000 Materials Ledger No. 8 Wood—Maple Dec. 1 6,000 (b) 13,000 credit Utilities Payable, $900 (a) 10,500 d. Factory overhead incurred in production (utility bill, $900) Glue Dec Sandpaper Dec (continued)

30 Summary of Cost Flows for Legend Guitars
Materials Factory Overhead Work in Process Dec. 1 6,500 Dec Dec ,000 (b) ,000 (d) 500 (a) ,500 (d) 500 (d) 900 (b) ,000 (d) 1,200 (c) 11,000 credit Accumulated Depreciation, $1,200 Materials Ledger No. 8 Wood—Maple Dec. 1 6,000 (b) 13,000 (a) 10,500 d. Factory overhead incurred in production (depreciation on factory machinery, $1,200) Glue Dec Sandpaper Dec (continued)

31 Summary of Cost Flows for Legend Guitars
Materials Factory Overhead Work in Process Dec. 1 6,500 Dec Dec ,000 (b) ,000 (d) 500 (a) ,500 (d) 500 (d) 900 (b) ,000 (d) 1,200 (c) 11,000 (d) 2,000 credit Wages Payable, $2,000 Materials Ledger No. 8 Wood—Maple Dec. 1 6,000 (b) 13,000 (a) 10,500 d. Factory overhead incurred in production (indirect labor, $2,000) Glue Dec Sandpaper Dec (continued)

32 Summary of Cost Flows for Legend Guitars
e. Factory overhead is applied to jobs according to the predetermined overhead rate (continued)

33 Summary of Cost Flows for Legend Guitars
Materials Factory Overhead Work in Process Dec. 1 6,500 Dec Dec ,000 (b) ,000 (d) 500 (a) ,500 (d) 500 (d) 900 (e) 4,250 (b) ,000 (d) 1,200 (c) 11,000 (d) 2,000 (e) 4,250 Materials Ledger Job Cost Sheets No. 8 Wood—Maple 20 Units of Jazz Series Guitars, Job 71 Dec. 1 3,000 (b) Direct materials 2,000 (c) Direct labor 3,500 Dec. 1 6,000 (b) 13,000 (a) 10,500 (e) Factory overhead 1,750 Glue Dec (d) 200 60 Units of American Series Guitars, Job 72 (b) Direct materials 11,000 (c) Direct labor 7,500 Sandpaper (e) Factory overhead 2,500 Dec (d) 300 (continued)

34 Summary of Cost Flows for Legend Guitars
Materials Factory Overhead Work in Process Dec. 1 6,500 Dec Dec ,000 (b) ,000 (d) 500 (a) ,500 (d) 500 (d) 900 (e) 4,250 (b) ,000 (d) 1,200 (f) 150 (c) 11,000 (d) 2,000 (e) 4,250 Materials Ledger debit Cost of Goods Sold, $150 No. 8 Wood—Maple Dec. 1 6,000 (b) 13,000 (a) 10,500 Glue Dec (d) 200 f. Closed underapplied factory overhead to cost of goods sold Sandpaper Dec (d) 300 (continued)

35 Summary of Cost Flows for Legend Guitars
Materials Factory Overhead Work in Process Dec. 1 6,500 Dec Dec ,000 (b) ,000 (d) 500 (g) 10,250 (a) ,500 (d) 500 (d) 900 (e) 4,250 (b) ,000 (d) 1,200 (f) 150 (c) 11,000 (d) 2,000 (e) 4,250 Materials Ledger Job Cost Sheets No. 8 Wood—Maple 20 Units of Jazz Series Guitars, Job 71 Dec. 1 3,000 (b) Direct materials 2,000 (c) Direct labor 3,500 (d) Factory overhead 1,750 10,250 Dec. 1 6,000 (b) 13,000 (a) 10,500 Glue Dec (d) 200 g. Job 71 completed in December Sandpaper Dec (d) 300 (continued)

36 Summary of Cost Flows for Legend Guitars
Materials Factory Overhead Work in Process Dec. 1 6,500 Dec Dec ,000 (b) ,000 (d) 500 (g) 10,250 (a) ,500 (d) 500 (d) 900 (e) 4,250 (b) ,000 (d) 1,200 (f) 150 (c) 11,000 (d) 2,000 (e) 4,250 Finished Goods Materials Ledger Dec. 1 20,000 No. 8 Wood—Maple (g) 10,250 Dec. 1 6,000 (b) 13,000 (a) 10,500 Glue Dec (d) 200 Finished Goods Ledger Jazz Series Guitars Dec. 1 20,000 Sandpaper (g) 10,250 Dec (d) 300 (continued)

37 Summary of Cost Flows for Legend Guitars
Work in Process Cost of Goods Sold Dec ,000 (g) 10,250 (f) (b) ,000 (c) 11,000 (e) 4,250 Finished Goods Dec. 1 20,000 (g) 10,250 h. Sold 40 units of Jazz Series guitars on account Finished Goods Ledger Jazz Series Guitars Accounts Receivable XXX Sales XXX Dec. 1 20,000 (g) 10,250 (continued)

38 Summary of Cost Flows for Legend Guitars
Work in Process Cost of Goods Sold Dec ,000 (g) 10,250 (f) (b) ,000 (i) ,000 (c) 11,000 (e) 4,250 Finished Goods Dec. 1 20,000 (i) 20,000 (g) 10,250 i. Cost of 40 units of Jazz Series guitars sold Finished Goods Ledger Jazz Series Guitars Dec. 1 20,000 (i) 20,000 (g) 10,250 (concluded)

39 Describe the use of job order cost information for decision making.
Learning Objective 3 Describe the use of job order cost information for decision making.

40 Job Order Costing for Decision Making
LO 3 Job Order Costing for Decision Making A job order cost accounting system accumulates and records product costs by jobs. The resulting total and unit product costs can be compared to similar jobs, compared over time, or compared to expected costs.

41 Learning Objective 4 Describe the flow of costs for a service business that uses a job order cost accounting system.

42 Job Order for Professional Services
LO 4 Job Order for Professional Services Since the “product” of a service business is service, management’s focus is on direct labor and overhead costs. A job cost sheet is used to accumulate the costs for each client’s job. When the job is completed and the client billed, the costs are transferred to a cost of services account.