Download presentation
Presentation is loading. Please wait.
Published byHartanti Lie Modified over 6 years ago
2
Power Design Rodger Hyle
3
What we can do 3
5
What we need to do it Load Profile:
What is the equipment that is consuming power? What is the voltage required by this equipment? What is the power draw Watts or Amps Is utility power available at the site? Does the equipment need to run if power fails and if so for how long? Does the power system need to be redundant?
6
Why Tessco?
7
EXPERT DESIGN TEAM Industry Leading Systems Design and Engineering Providing Optimal Efficiency Across Multiple Technological Platforms
8
EXPERT DESIGN TEAM Expertise across multiple technology platforms ensures total system design optimization. Complete End-to-End solutions design practice means everything needed is included and has been vetted to insure seamless interoperability. Designs leverage stocking program components to ensure immediate inventory availability avoiding potentially costly deployment delays.
9
Thank You Rodger Hyle
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.