Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.

Similar presentations


Presentation on theme: "Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez."— Presentation transcript:

1 Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez Mingo

2 NEGOTIATION PROCESS Scientific and technical negotiation
Administrative and financial aspects Communication and dissemination aspects Participants Portal (IT support) 2

3 Sending of a negotiation letter (not a commitment to fund) with:
The Evaluation Summary Report The Negotiation Mandate An Ethical Review Report (where applicable) BEGIN OF NEGOTIATION Today

4 Technical clarification and changes to the project to be addressed during negotiations
Maximum Community Contribution Duration for the project Deadline for receipt of the first drafts of DoW and GPFs Deadline for completion of negotiation Contact details of the responsible Project Officer Pictures taken from: Check List NEGOTIATION MANDATE

5 EVALUATION SUMMARY REPORT
Comments of the evaluation panel on: Scientific/technological excellence Implementation Impact and dissemination + RECOMMENDATIONS. 5

6 DRAFTING THE DESCRIPTION OF WORK - The DoW
Address the comments made in the Evaluation Summary Report and the Negotiation Mandate (a separate explanation of how this has been done is requested) Based on the layout of the Proposal Follows a specified template DRAFTING THE DESCRIPTION OF WORK - The DoW 6

7 THE COMPOSITION AND LOGIC STRUCTURE OF A RESEARCH PROJECT
Management THE COMPOSITION AND LOGIC STRUCTURE OF A RESEARCH PROJECT Work plan: Work packages - Tasks (related to objectives) - Timing and milestones Overall objective - Concept - Objectives - Methodology Project deliverables Communication and dissemination Impacts Innovation 7

8 IMPACT KEY Questions Deliverables PROJECT OBJECTIVES Tasks
Reporting Contractual Obligations Tasks WorkPackages Deliverables Deliverables should clearly answer the key questions of the project an clearly show how the project objectives and expected impact are met.. Progress achieved toward the project objectives has to be reported during the life of the project (not only at the end). N.B. Periodic and Final reports are not considered as ‘deliverables’.

9 STRUCTURE OF THE DESCRIPTION OF WORK
Annex I to the Grant Agreement Part A of the DoW - Structured Data Cover Page Table of contents A1 The project summary A2 The list of beneficiaries A3 The budget breakdown 8 Workplan Tables (lists of WPs, deliverables, milestones etc…) Part B of the DoW - “Narrative” text based on Part B of the proposal, uploaded as a PDF file Automatically filled via GPFs To be filled in on-line

10 DoW – Part B Concept, objectives, state of the art
Based on Part B of the Proposal B 1.1 Concept and project objectives Objectives should be: S – Specific M – Measurable A – Attainable R – Realistic T - Timely B 1.2 Progress beyond the state of the art To be shortened, but “baseline” and performance/research indicators to be added B 1.3 Methodology and associated work plan Overall strategy and general description Timing of work packages and their components Description of WP, deliverables  Part A of the DoW DoW – Part B Concept, objectives, state of the art

11 DELIVERABLES Deliverables should be: Limited in number Specific
Each significant project element should conclude with a deliverable, which is the concrete output and evidence of the work. DELIVERABLES Deliverables should be: Limited in number Specific Clear and Verifiable Quality Controlled PU status if possible - Think carefully about allocated person/months WORK PACKAGE TASK COMPONENT DELIVERABLE PROJECT

12 COMPULSORY DELIVERABLE
In addition to the Contractual reporting requirements A Project Website (in the .EU domain recommended) which must be kept updated Guidelines available at: COMPULSORY DELIVERABLE

13 DoW – Part B Implementation
BASED ON PART B OF THE PROPOSAL B.2.1 Management structure and procedures B.2.2 Beneficiaries B.2.3 Consortium as a whole Important: Sub-contracting, Third parties etc. to be well explained B.2.4 Resources to be committed Explanations in addition to “project efforts and costs” table of Part A 13

14 DoW – Part B Impact SECTION 3 IMPACT B.3.1 Strategic impact
Based on Part B of the Proposal B.3.1 Strategic impact B.3.2 Dissemination and communication SECTION 3 IMPACT Pictures taken from: Chat Community 14

15 EXPECTED IMPACTS Advancing Science Patents
Policy Impacts/contribution to standards Contribution to Europe 2020 Stakeholder Involvement European Dimension International Dimension REMEMBER : Document and REPORT. EXPECTED IMPACTS 15

16 DISSEMINATION Separate Work Package recommended
Optimal dissemination/use/exploitation of the project results should be ensured A coherent communication strategy should be set-up (possibly as a deliverable) Clearly described objectives, target groups and means Detailed List of Planned Dissemination Activities An interim version of the dissemination and use plan (e.g. at mid-term) should be foreseen. DISSEMINATION

17 FACT SHEETS Required for all projects and updated regularly. Clear, understandable, up-to date information on Project and results targeted to a wide audience and giving clear indications on policy/societal relevance.

18 DoW – Part B Ethics and Gender
B.4 Ethical issues B.5 Gender aspects 18

19 COMPLETION OF NEGOTIATIONS
When agreement is reached on The DoW The GPFs The Start Date The Duration Any Special Clauses COMPLETION OF NEGOTIATIONS Pictures taken from: Hand in Hand Together

20 Here we are: 22/05/2013 24/05/2013: Deadline for all participants to register through the Unique Registration Facility and, when required, submit supporting documents for their validation and the verification of their financial viability; 29/05/2013: Deadline for the first version of the Description of Work (Annex I to the Grant Agreement) and the GPFs; 25/07/2013: End of negotiations (final agreement on the Description of Work, GPFs and any specific clauses to be included in the grant agreement). Next: Finalise grant agreement approved and send to the coordinators. (End of August).

21 Thank you for your attention!
Enjoy your project ! Updated 3/10/2006 – changed URLs and replaced address with enquiries service Updated CORDIS URL on 7/11/2006 Thank you for your attention!