Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013 Tomas Turecki DG Research and Innovation Unit I.2 Environmental Technologies
2
NEGOTIATION PROCESS Scientific and technical negotiation
Administrative and financial aspects Communication and dissemination aspects Participants Portal (IT support) 2
3
Sending of a negotiation letter (not a commitment to fund) with:
The Evaluation Summary Report The Negotiation Mandate Further information for the negotiation An Ethical Review Report (where applicable) START OF NEGOTIATION
4
Technical clarification and changes to the project to be addressed during negotiations
Maximum EU Financial Contribution Project duration Deadline for receipt of the first drafts of DoW and GPFs Deadline for completion of negotiation Contact details of the Project Officer in charge Pictures taken from: Check List NEGOTIATION MANDATE
5
EVALUATION SUMMARY REPORT
Comments of the evaluation panel on: Scientific/technological excellence Implementation Impact and dissemination + RECOMMENDATIONS (Any other remarks). 5
6
What is the way forward? Description of Work (DoW)
Image courtesy of Evgeni Dinev/FreeDigitalPhotos.net
7
Based on the Proposal Follows a specified template Address the comments made in the Evaluation Summary Report and the Negotiation Mandate (a separate explanation of how this has been done is requested) DRAFTING THE DESCRIPTION OF WORK - The DoW 7
8
THE COMPOSITION AND LOGICAL STRUCTURE OF A PROJECT
Management THE COMPOSITION AND LOGICAL STRUCTURE OF A PROJECT Work plan: Work packages - Tasks (related to objectives) - Timing and milestones Overall objective - Concept - Objectives - Methodology Project deliverables Communication and dissemination Impacts Innovation 8
9
STRUCTURE OF THE DESCRIPTION OF WORK
Annex I to the Grant Agreement Part A of the DoW - Structured Data Cover Page Table of contents A1 The project summary A2 The list of beneficiaries A3 The budget breakdown 8 Workplan Tables (WTs) (lists of WPs, deliverables, milestones etc…) Part B of the DoW - “Narrative” text based on Part B of the proposal, uploaded as a PDF file Automatically filled via GPFs To be filled in on-line
10
DoW – Part B Concept, objectives, state of the art
Based on Part B of the Proposal B 1.1 Concept and project objectives Objectives should be: S – Specific M – Measurable A – Attainable R – Realistic T - Timely B 1.2 Progress beyond the state of the art SoA desciption can be shortened, but “baseline” and performance indicators to be added B 1.3 Methodology and associated work plan Overall strategy and general description Timing of work packages and their components Description of WP, deliverables Part A of the DoW DoW – Part B Concept, objectives, state of the art
11
DELIVERABLES Specific Clear and Verifiable Quality Controlled
Each significant project element should conclude with a deliverable, which is the concrete output and evidence of the work. Deliverables should be: Limited in number Specific Clear and Verifiable Quality Controlled PU status if possible DELIVERABLES Periodic and Final reports are not considered as ‘deliverables’.
12
DoW – Part B Implementation
BASED ON PART B OF THE PROPOSAL B.2.1 Management structure and procedures B.2.2 Beneficiaries B.2.3 Consortium as a whole Important: Sub-contracting, Third parties etc. to be well explained B.2.4 Resources to be committed Explanations in addition to “project efforts and costs” table of Part A 12
13
DoW – Part B Impact SECTION 3 IMPACT B.3.1 Strategic impact
Based on Part B of the Proposal B.3.1 Strategic impact B.3.2 Dissemination and communication SECTION 3 IMPACT Pictures taken from: Chat Community 13
14
Creation of market opportunities and increased demand for innovation.
Contribution to the aims of the EIP on Water Contribution to water related policies Contribution to Europe 2020 Flagship Initiative on Innovation Union REMEMBER : Document and REPORT. EXPECTED IMPACTS 14
15
DISSEMINATION Separate Work Package recommended
Optimal dissemination/use/exploitation of the project results should be ensured A coherent communication strategy should be set-up (possibly as a deliverable) Clearly described objectives, target groups and means Detailed List of Planned Dissemination Activities An interim version of the dissemination and use plan (e.g. at mid-term) should be foreseen. DISSEMINATION
16
COMPULSORY DELIVERABLE
A Project Website (in the .EU domain recommended) which must be kept updated COMPULSORY DELIVERABLE
17
COMPULSORY DELIVERABLE
Policy brief (at least one policy-relevant synthesis of project results) To upload to Water Knowledge Portal
18
FACT SHEETS Required for all projects and updated regularly. Clear, understandable, up-to date information on Project and results targeted to a wide audience and giving clear indications on policy/societal relevance. Template will be provided
19
DoW – Part B Ethics and Gender
B.4 Ethical issues B.5 Gender aspects 19
20
COMPLETION OF NEGOTIATIONS
When agreement is reached on The DoW The GPFs The Start Date The Duration Any Special Clauses COMPLETION OF NEGOTIATIONS Pictures taken from: Hand in Hand Together
21
Here we are: 24/06/2013 28/06/2013: Deadline for all participants to register through the Unique Registration Facility and, when required, submit supporting documents for their validation and the verification of their financial viability; 12/07/2013: Deadline for the first version of the Description of Work (Annex I to the Grant Agreement) and the GPFs; 13/09/2013: End of negotiations (final agreement on the Description of Work, GPFs and any specific clauses to be included in the grant agreement). Next: Finalised grant agreement approved and send to the coordinators. (mid-October).
22
Image courtesy of Evgeni Dinev/FreeDigitalPhotos.net
23
Image courtesy of Evgeni Dinev/FreeDigitalPhotos.net
24
Best of luck!!! Updated 3/10/2006 – changed URLs and replaced address with enquiries service Updated CORDIS URL on 7/11/2006
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.