Presentation is loading. Please wait.

Presentation is loading. Please wait.

Berlin, 15 December 2011 update

Similar presentations


Presentation on theme: "Berlin, 15 December 2011 update"— Presentation transcript:

1 Berlin, 15 December 2011 update
Security SIG in MTS Fraunhofer FOKUS Tallinn, 4-5 October 2011 Berlin, 15 December 2011 update Sphia Antipolis 13 March 2012 Göttingen, 15 May 2012

2 Work item overview & status Discussion of work progress
Agenda SIG#3 Round Call Work item overview & status Discussion of work progress Relation to other groups/events Next steps, perspectives: E2NA, Security workshop, SIG#4?

3 Recall of SIG history Plan for Security-SIG in MTS (Tallin, 10/2011)
SIG#1 (Berlin, 12/2011) Discussion on scope: specification, analysis, testing 3 NWIs „wording“: terminology, case study experiences (2nd half 2012), design guide Appointment of rapporteurs: Ari T. and Scott C. SIG#2 (Sophia, 03/2012) Start of Wiki initiative about terminology Draft on security design guide (with lifecycle diagram) Need for more promotion

4 Security Testing Terminology and Concepts - STATUS
not a pure listing of definitions but an introduction of terms using full text to avoid copyright issues and to allow comparison without “re-definition“ Abstract  TBD Introduction (focus/promote new testing areas)  TBD Basic terminology  listing available, text TBD Risk Assessment (TVRA)  first input, TBD Functional Testing  general overview available, but specific parts TBD Penetration Testing  TBD Vulnerability Testing  TBD Performance Testing  TBD Fuzzing  available Please JOIN & Contribute:

5 SIG#2 APs Invite people from other ETSI TC‘s: AP: Scott invite OCG_security (done) Wiki text should not only be a list of words, but with text and tutorial character (in progress) Invite CTI to check Contents (open) Steve: the introduction part should focus/promote new testing areas (open)

6 SIG#2 reminders Steve: opportunity for ETSI Security workshop
MTS to chair a security testing session Start to plan topics, areas of interests CfP expected in September Discussion on the lifecycle: no normative agreement on penetration testing available, Ian provides new lifecycle diagram -> design guide

7 SIG future work Allocate responsible people for Wiki sections?
Relations to E2NA-security? SIG continuation to be decided: SIG#4 phone call only (July)? SIG#5 before MTS#57 (18.09.)?


Download ppt "Berlin, 15 December 2011 update"

Similar presentations


Ads by Google