ELCITA UPDATE September 2016
2
Estate Management Skywalk E – Toilets 16 e-toilets operational.
M/s mayaPRAXIS have submitted the draft report - Preliminary Feasibility Study on Skywalk system for Electronics city phase 1. E – Toilets 16 e-toilets operational. Estate survey Roads & common area survey completed for Phase 1& 2. Plot Inventory of the Industries 100 % completed. GIS Web Application Software Installed in ELCITA server. Testing work in progress.
3
Road Works – Completed Wipro Neeladri Road – Under Progress
Concrete Pavements along Doddanagamangala Village Road
4
Drain Works – Under Progress
Drain Work towards Goa Estate Drain Work along TCS Road
5
Drain Works – Under Progress
Kerbstone work for 300KLD STP Road RCC Culvert Opp MSME Building
6
6KL capacity Sump in KIADB Ecity East Phase
Drain Works – Under Progress 6KL capacity Sump in KIADB Ecity East Phase Doddathogur Drain
7
Drain Works – Under Progress
Drain work at Celstream RCC Drain work at Ramsoft Road
8
Drain Works – Under Progress
Sewer line work Opp Canara Bank. Pavers/Drain work at Amphenol
9
Drain Works – Under Progress
Drain work at Ramakrishna Hospital SSM Drain work along Rajakaluvae to continue the Footpath
10
Drain Works – Under Progress
Drain work at JP IT Park Road Kerbstone Raising work at KSSIDC Complex
11
Drain Works – Completed
Drain Work From Wipro Gate 5 to Wipro Gate 16 Drain Work in front of CDac
12
Drain/Footpath Works – Completed
Removing the existing pavers & laying the new Pavers at Salarpuria Info Zone Police Station Drain
13
Misc Works – Completed Petty Shop Removed and covered at Tech Mahindra road Barbed Wire Fencing at Pump House
14
Misc Works – Completed Road Widening from RS Electronics to Flextronics Road Widening at Pumphouse
15
Misc Works – Completed Replacing the existing chamber cover with RCC heavy slab with Chequer Plate.
16
Pot Hole Filling Works – Completed
17
Painting Works – Completed
Kerbstone Painting along Velankani Road, HP Avenue & Wipro Avenue etc.,
18
Sustainability Projects
RWH works – Under Progress SI.NO DESCRIPTION NO OF PITS STATUS 1 RAIN WATER HATVESTING PIT 47 COMPLETED 2 WORK IN PROGRESS
19
20 feet deep well Rainwater Harvesting Pit at Various locations
20
Estate Management Contract Awarded
Providing and laying of Asphalting using 60/70 grade bitumen along Café Corner & JP IT Park Road MSME Entry Gate to Exit Gate for 300KLD STP KSSIDC Complex Road Construction of Drains, laying of Pavers, Kerb stones and Drain cover slabs along TCS Road
21
Estate Management Contracts on Anvil
Providing House Keeping Services to ELCITA within Ecity Industrial Area. Providing Security Services to ELCITA within Ecity Industrial Area. Construction of Concrete Drains, laying of Pavers, Kerb stones and Drain cover slabs along XIME Road Petrol Bunk Road & Golden Tulip Road Landscaping work below fly over (Phase 1 & 2) Providing UGD to connect industries in cluster 2 & 3 to the 300 KLD STP. Construction of 500 KLD STP in KIADB Land, Electronics City Phase 2
22
Thank You