Download presentation
Presentation is loading. Please wait.
Published byMarcin Kuczyński Modified over 5 years ago
1
Gemini Code Contingency Testing – Exercise Star
2
Background Code Contingency Guidelines Document contains procedures with clear responsibilities on Shippers, National Grid and Xoserve in the event of a failure of the Gemini System. Guidelines state procedures to be tested at least every 2 years. Xoserve is co-ordinating the Test Programme for the first planned test exercise to take place in September 2010. Notice of this test has been given via UK Link Committee 100% Participation of all shippers is expected.
3
Details Name: Exercise Star Date: 8th September 2010
Test Areas: Energy Balancing GE01 – Nominations & Trade nominations (EOD Noms) GE01 – Enhanced operations (DM Nominations) Market Operator nominations Entry Capacity GC04 – Short Term Entry Capacity – WDDSEC GC04 – Short Term Entry Capacity – DISEC GC06 – Entry Capacity Trading – within day trades only Participants: All Shippers; Shippers Agents (if appropriate) APX (Market Operator) National Grid Transmission Xoserve Tools: ANS, Telephone, Fax, Communications, Joint Office Website
4
Contact Details A document pack containing all details of Exercise Star will be made available on the Joint Office website prior to the Exercise. All communications will be pre-fixed ‘Exercise Star’. A feedback questionnaire will be available after the Exercise for all Shippers to complete. Questions/queries: or National Grid (Nav Dosanjh) or (Nicola Forrest) Xoserve
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.