2. The Odense PRB Work Plan 2005-06
PRB-Phase II Workshop 7-8th March 2006, Stresa, Italy Odense Pilot River Basin The Danish Pilot Project for Implementing the EU Water Framework Directive Harley Bundgaard Madsen Head of Marine- and Hydrology Department, Fyn County, DK 1. The Odense River Basin 2. The Odense PRB Work Plan 3. Developing cost-effective Programme of Measures 4. Odense PRB input to SSG Pressure and Impact Programme of Measures 5. Odense PRB-input to WG B 6. Inputs to WG A, D and E
2
Odense River Basin Land use: Agriculture: Urban areas: 16%
Woodland: 10% Nature (meadows, mires, dry grasslands, wetlands): 6% Agriculture: 1870 farms (50% livestock farms) Livestock production: LU (59% pigs, 37% cattle), 1 mill. pigs/year Livestock density: 0,9 LU/ha Odense Fjord Natura 2000 areas Odense City ( inhab.) Odense River
3
Odense PRB Work Plan 2005-06 TIME 2005 2006 2007 Actions 1 2 3 4
Integrated Programme of Measures: Analysis of Agricultural pressure and impact x Analysis of Agri Rural Development Programme in Odense RB Analysis of CAP and other EU-policies in relation to WFD in Odense RB Establishment of nutrient target loads (pressure) from agriculture and other sources in Odense RB Scenarios on measures to reduce nutrient pressure Cost-effective analysis of programme of measures Development of a Pilot River Basin Management Plan (PoM, Public participation, monitoring, policy requirements) Deliverables to Strategic Steering Group WFD/Agri (SSG) Deliverables to EU Strategic Steering Group, WG A, B, D, E Lay-man report Conference
4
Odense PRB Activities 2005- in general
Developing a Pilot River Basin Management Plan for Odense River Basin in 5 provisional thematic Programme of Measures including economic calculations on costs and measures to combat eutrophication and hydromorphological destruction of the surface waters and ground water in the OPRB (in Danish). 3 technical meetings and 2 advisory board meetings (public and/or stakeholders) (3 different groups) with representatives from NGO’s, authorities, firms etc., on Danish regional and national level. Progress reports to EU on the PRB activities. 3-4 July 2005: OdensePRB-leader attended the PRB-Steering Group Meeting. Input to SSG and other CIS working groups Input to EU research projects: Euroharp, Bridge, Conwoy, Rebecca, HarmoniRib, EuroLimpacts, FATE model testing
5
Developing Cost Effective PoM’s Conclusions of the WFD Article 5 Provisional Report
Water courses will not achieve ”good ecol. status” due to hydromorphological conditions and/or waste water discharges Lakes will not achieve ”good ecol. status” primarily due to nitrogen (N) and phosphorous (P) loadings, primarily from agricultural sources Odense Fjord – as lakes, incl. hazardous subst. Groundwater will (locally) not achieve ”good qualitative status” due to haz. subst., pesticides and nitrate
6
Cost effective analyses
Marginal costs DKK pr. % target fulfilment 20.000 40.000 60.000 80.000 0% 25% 50% 75% 100% 125% 150% % target fulfilment Cost effective fulfilment of a target by ranking the measures and their potential according to cost-effectiveness (marginal cost).
7
Level of CEA analysis Operational objectives
12 sub-basins 11 largest lakes and the Fjord N and P objectives: Required N and P load reduction (tonnes/year). Hydromorph. conditions: Cannot quantify objectives Not suitable for cost minimisation Estimated a total fixed dosage of specific measures and total costs. Groundwater: 1/3 of nitrate sensitive extraction area/WB need implementation of one of three measures.
8
Integrated Programme of Measures The importance of the retention factor
Odense Fjord
9
Measure categories Optimizable measures ”Must do” measures
Afforestation Wetlands Areas with catch crops Areas of organic farming Improved waste water treatment in sparsely built up areas (N, P) *Groundwater: Permanent grassland Cultiv. red.fertilization All measures related to streams (hydromorph. cond.) Removal of fish obstructions Re-winding of streams/buffer zones Re-opening of piped streams, etc. 10m crop free buffer zones around smaller lakes Buffer zones around abstractions holes (pesticides) Waste disposal sites (hazardous substances)
10
Hydromorphological measures Re-winding of streams/buffer zones
11
(very) Provisional results
Price of meeting objectives in OPRB: 13-20 milllion Euros 80% distributed on measures to improve hydromorphological conditions and to reduce pollution from sparsely built up areas. Measure Cost-effectiveness (Euros/kg N) Agriculture Wetlands Buffer strips Afforestation 2.5-27 7 14 22 Waste water (point sources): Storm water outfalls waste water treatment sparsely built up areas
12
Cost effective analyses Step by step
Operational objectives. Sub-basin level of analysis decided Estimate and include effects of baseline measures Identify relevant measures to solve problems in water bodies Unit effects (Kg N/ha) Unit costs (EURO/ha) Cost-effectiveness (EURO/kg N) Maximum potential dosage in each sub-basin (e.g. by GIS) Cost-effectiveness curves for each sub-basin and groundwater area Estimate downstream effects of measures to get an integrated analysis Find most cost-effective solution including downstream effects and calculate total costs of POM If necessary adjust dosages/placing of measures. Different scenarios.
14
Odense PRB input to SSG Meetings:
25th April 2005: SSG meeting in Brussel. Odense PRB – presentation. Links between WFD and Agriculture” 8-10 September 2005: Meeting in the SSG-network of Agricultural PRB’s. Odense PRB – presentation 20-21 September 2005 in London: SSG-conference and meeting Pressure and Impact analyses: Providing input and ideas for an indicator based report from all the PRB’s on Agriculture Pressure and Impact and Measures to deal with these pressures. Comments to background paper (Ecologic): ”WFD and Agriculture – Analyses of the pressures and Impacts”. Filling out Pressure and Impact -template Programme of Measures: Answering questionnaire on ”Programmes of Measures under the light of Agriculture” Filling out PoM-templates: Indicators of measures; Basic measures and supplementary measures
15
Odense PRB input to WG B (Integrated River Basin Management)
Meetings: Oct. 2005: Meeting in Brussels : Meeting in Brussels. Odense PRB presentation of contributions to CEA : Meeting in Brussels (delimited group to synthesize contributions to CEA). Odense PRB presentation and summary of provisional experiences on CEA in Odense PRB
16
Odense PRB input to other WG’s
No activity!
17
Odense Pilot River Basin
Thank you for your attention…
18
Agri Environmental Schemes (Agreements on Environmental friendly farming)
Applications for financial support 2004 (mill DKK) Available financial support (mill DKK) Denmark Fyn County (1/10 x DK) Natura 2000 Other areas 460 916 31 44 310 ~ 31 Natura 2000 areas: 2% of total area of Fyn County Nature areas: 6% of total area of Fyn County