Download presentation
Presentation is loading. Please wait.
1
LOI – Next Steps? John Thomason
2
ISIS Schedule
3
Possible Workplan (1) January experiments go well
Experiments in R5.4 to show full operation of system with integration of ISIS LPRF, cure for oscillations in IA, etc. ISIS staff complete break-out box and cabling to synchrotron and prepare LOI HPD and water manifold for move to synchrotron SP6 First experiments with beam in synchrotron January experiments go well 4 x ISIS 2RF systems fully commissioned ISIS management approval to operate so close to first real TS-2 beam Assumes:
4
May/June 2008
5
Possible Workplan (2) January experiments go well
Experiments in R5.4 to show full operation of system with integration of ISIS LPRF, cure for oscillations in IA, etc. ISIS staff complete break-out box and cabling to synchrotron and prepare LOI HPD and water manifold for move to synchrotron SP6 First experiments with beam in synchrotron January experiments go well 4 x ISIS 2RF systems not fully commissioned No ISIS management approval to operate so close to first real TS-2 beam Assumes:
6
August/September 2008
7
Possible Workplan (3) More experiments in R5.4 needed
Experiments in R5.4 to show full operation of system with integration of ISIS LPRF, cure for oscillations in IA, etc. ISIS staff complete break-out box and cabling to Synchrotron SP6 First experiments with beam in synchrotron (to be decided after June experiments) Further experiments in R5.4 More experiments in R5.4 needed 4 x ISIS 2RF systems fully commissioned ISIS management approval to operate so close to first real TS-2 beam Assumes:
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.