1 Ions for EVs Create an assessment tool- Highlight Local First Hill Seattle EV Charging Infrastructure

2 PEV Plug-In Electric Vehicles Charging
What is an PEV- not a Prius- Hybrid or Volt, but some Prius are PEV Tesla Model 3, S and X, Nissan Leaf And Chevy Bolt, KIA Soul, Mitsubishi I MiEV- ZEV States Charging Infrastructure L1- 120v at home 16 to 30 hrs L2 240V 2 to 4 hours DCFC-30 minutes, 480v, 3-phase power

3 Create an assessment tool- Data Sources
US Census data 2010, current Housing Data Trulia and Zillow demographics by zip code WA Department of Licensing EV registration/ownership Residential home changing, vs multifamily – 80% Urban garage orphan New vs used EV ownership Utility as the fuel provider- not gas stations depot model Autonomous Vehicles

4 EVs for Ions Andrea Tousignant- worked for a solar Installer 2 years, as EV Program Manager…..UW Evans School MPA, some urban planning, economic and political geography Learned Residential, and then Commercial EV installation Involved in local Seattle and WA State Stakeholder groups Often work with Sustainability Managers Able to offer introduction with City of Seattle Office of Sustainability, Green Fleets, WSDOT, SU Sustainability office Ions for EV’s- Independent Consultant and EV sales,

5 Insufficient charging infrastructure, First Hill, Seattle
Insufficient EV charging- great local urban example in your backyard 1. Create a tool to highlight need- make case 2. Using recent Urban data on what should be 3. Look at EV App tools, most up to date See current state- Plugshare, ChargePoint, SemaConnect, Greenlots

6 See current state- Plugshare, ChargePoint, SemaConnect, Greenlots

7 Required/Desired Number
Where should charging be installed based on needs data SU Transportation survey fall 2017 Facilities or Operations department run the Sustainability planning

8 Install- New construction or retrofit
New technology overlays with a coinciding shift in societal needs City of Seattle EV Readiness New Construction Land Use Code Other city requirement Retrofit cost, pilot programs, City Explain intricacies of the business and how and how they match up with the dynamics of the market Seattle in progress map- download data Electrify America- funding for this

9 How it will work Assessment based on GIS spatal data
Map out expected results Follow up with Institutions- SU, Swedish Hospital, other players Funding model of interest Action steps- local contact transportation surveys Commute Seattle EV vs public transit