TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
2034 Reference Case Update TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC Western Electricity Coordinating Council
2
Western Electricity Coordinating Council
Discussion Topics Transmission Models Load Models Generation Models Optimization Goals Optimization Constraints Economics Preliminary Results & Observations Analytics & Metrics Next Steps Western Electricity Coordinating Council
3
Western Electricity Coordinating Council
2034 Reference Case Update Transmission Models Western Electricity Coordinating Council
4
Western Electricity Coordinating Council
Reduced Network Model 20,000+ bus full network model (FNM) reduced to 500- bus reduced network model (RNM) Boundary flows of RNM within 1% FNM Western Electricity Coordinating Council
5
Transmission Candidates
Reduced Network Candidate Corridors Western Electricity Coordinating Council
6
Transmission Candidate Assumptions
Focus is WECC transmission paths and on inter-regional transmission needs. Intra-regional transmission assumed to be adequately reinforced. Utilization of existing transmission infrastructure will be maximized as much as possible before any new transmission infrastructure is built. Percentage of power flows on new and existing infrastructure relative to line ratings required to be balanced. Western Electricity Coordinating Council
7
Balanced Transmission Power Flows
Power flows on new candidate line(s), as a percentage of line ratings, balanced with existing transmission infrastructure loading(s). Western Electricity Coordinating Council
8
Transmission Equivalent Links
Western Electricity Coordinating Council
9
Transmission Candidates
Pc% Adj Candidate Adj Pe% Pc% = Pe% Western Electricity Coordinating Council
10
Transmission Technologies
Approximately 1000 candidate corridors. Single and double circuit AC technology types at 230 kV, 345 kV, and 500 kV. Two DC technology types at 500 and 600 kV. Library of corridors geospatially optimized to minimize environmental impact and to capture terrain and ROW costs. Western Electricity Coordinating Council
11
Western Electricity Coordinating Council
2034 Reference Case Update Load Models Western Electricity Coordinating Council
12
Load Model Enhancements
Itron Load Forecasting Tool (LFT) used to produce Year-20 energy and demand load forecasts. Eight load duration blocks co-optimized. Four seasons with heavy and lite load levels each. Western Electricity Coordinating Council
13
Western Electricity Coordinating Council
2034 Reference Case Update Generation Models Western Electricity Coordinating Council
14
Western Electricity Coordinating Council
Generation Models Common Case generating units and technology type characteristics captured as existing generation. Future candidate technology types obtained from TEPPC Generation Capital Cost Tool. Future candidate renewable generating units and technology type characteristics derived from NREL data. Future candidate non-renewable generating units and technology type characteristics derived from TEPPC Generation Capital Cost Tool. Western Electricity Coordinating Council
15
Western Electricity Coordinating Council
Generation Models Three types of generation aggregation hubs: TEPPC state/area hubs Renewable energy hubs (WREZ) Natural gas hubs Hubs modeled as geospatial centroids. Western Electricity Coordinating Council
16
Western Electricity Coordinating Council
2034 Reference Case Update Optimization Goals Western Electricity Coordinating Council
17
Western Electricity Coordinating Council
Optimization Goals Approximately 200 Generation Goals Captured Policy Goals Renewable Portfolio Standards (RPS) Annual State/Province/Country Energy Targets Tiers & Carve-outs Common Case Earmarks Reliability Goals State, Area and System Reliability Flex Energy (MWh) & Demand/Capacity (MW) Other Western Electricity Coordinating Council
18
Western Electricity Coordinating Council
Optimization Goals Sequencing Priorities Shared-by Roll-ups Candidate Qualification Factors Load ratios, targets, credit ratios Flex Associations Western Electricity Coordinating Council
19
Colorado Goals Example
Western Electricity Coordinating Council
20
Western Electricity Coordinating Council
Oregon Goals Example Western Electricity Coordinating Council
21
Optimization Constraints
Pooled & Locational Annual Consumption/Production Rates & Limits Fuel (e.g., renewable) Water Carbon Other Western Electricity Coordinating Council
22
Western Electricity Coordinating Council
2034 Reference Case Update Economics Western Electricity Coordinating Council
23
Western Electricity Coordinating Council
Economics Levelized Cost of Energy TEPPC Generation Capital Cost Tool (E3) TEPPC Transmission Capital Cost Tool (Black & Veatch) Review of Financing Parameters Review of Technology Types Western Electricity Coordinating Council
24
Western Electricity Coordinating Council
2034 Reference Case Update Preliminary Results Western Electricity Coordinating Council
25
Western Electricity Coordinating Council
Reduced Network 23hs1a Balanced Generation across Western Interconnection. North-South flows across from BC and PNW. East-West from Montana to PNW. East-West from DSW to SoCal. Western Electricity Coordinating Council
26
1rst Pass – Deficit of Generation in Canada
South-North Flows to Canada due to 93% BC and 30% AB renewable targets. Lack of modeled candidate renewable generation in BC and AB to meet self-serve assumptions. Western Electricity Coordinating Council
27
2nd Pass – Gap Renewable Resources added in Canada
North-South Flows from Canada re-established. Gap hydro added to BC, gap wind added to AB. Renewable targets met in Canada. Excess non-renewable available in Canada. Western Electricity Coordinating Council
28
2nd Pass - Transmission Expansion Needs
Interconnection of Canadian Renewables. North-south Canadian Exports. North-South flows on COI. South-North flows of SE Colorado Wind. East-West flows of New Mexico Wind. East-West flows to DSW. Western Electricity Coordinating Council
29
Western Electricity Coordinating Council
2034 Reference Case Update Analytics & Metrics Western Electricity Coordinating Council
30
Western Electricity Coordinating Council
Analytics & Metrics Input parameters and assumptions. Goal and Constraint Audits. Locational (Hub) metrics. Transmission path utilizations and constraints. Power Flows and System Reliability. Generation Technology. Fuel Mix. Policy. Economics Geospatial. Western Electricity Coordinating Council
31
Western Electricity Coordinating Council
2034 Reference Case Update Next Steps Western Electricity Coordinating Council
32
Western Electricity Coordinating Council
Next Steps Continue Reference Case solution audit. Continue Analytic and Report development. Leverage consultants to help with stakeholder parameter and metric outreach. Western Electricity Coordinating Council
33
Western Electricity Coordinating Council
2034 Reference Case Update Questions? Michael Bailey, P.E. Senior Staff Engineer Western Electricity Coordinating Council 155 North 400 West Suite 200 Salt Lake City, Utah (801) Western Electricity Coordinating Council