Presentation is loading. Please wait.

Presentation is loading. Please wait.

08:00 Meeting Schedule TEM-PS test completed on Friday Sept. 26; baseline, test, and post-test data are burned to CD-ROM CAL cosmic data taking started.

Similar presentations


Presentation on theme: "08:00 Meeting Schedule TEM-PS test completed on Friday Sept. 26; baseline, test, and post-test data are burned to CD-ROM CAL cosmic data taking started."— Presentation transcript:

1 08:00 Meeting Schedule TEM-PS test completed on Friday Sept. 26; baseline, test, and post-test data are burned to CD-ROM CAL cosmic data taking started Saturday Sept. 27 Data taking configuration is CAL_LO trigger, CAL_TACK=60, TKR_TACK=0 188 hrs of shifts scheduled; for 75% livetime, expect 140 hrs x 30 Hz = 15 million triggers (500 good muons per 3mm along each log) Mon. Sept.22 Tues. Sept.23 Wed. Sept.24 Thurs. Sept.25 Fri. Sept.26 Sat. Sept.27 Sun. Sept.28 8a-4p Hiro, Johann, Larry Berrie, Larry 8a-4p Berrie, Hiro, Larry 8a-4p Xin 8a-4p Mizuno 4p-8p Hiro, Johann Johann, Larry 4p-8p Larry 4p-8p Hiro, Larry Mizuno 8p-12a Hiro 8p-4a Larry, Hiro TACK studies TEM-PS test CAL data Mon. Sept.29 Tues. Sept.30 Wed. Oct. 1 Thurs. Oct. 2 Fri. Oct.3 Sat. Oct.4 Sun. Oct.5 8a-4p Berrie 8a-4p Larry 8a-4p Jim 8a-4p Xin 8a-4p Mizuno 4p-8p Ric 4p-8p Gary 4p-8p Elliott 4p-8p Eduardo 4p-8p Mizuno 4p-8p Tune 8p-12a Hiro 8p-12a Marcus 8p-12a Mizuno 8p-12a Hiro CAL data Mon. Oct. 6 Tues. Oct. 7 Wed. Oct. 8 Thurs. Oct. 9 Fri. Oct.10 Sat. Oct.11 Sun. Oct.12 8a-4p Larry 8a-4p Brian 8a-4p Gary 8a-4p 4p-8p Tune 4p-8p Ric 4p-8p Eduardo 4p-8p Larry 8p-12a Hiro 8p-12a Hiro 8p-12a Mizuno CAL data High energy muon data VDG data

2 CAL_LO: Muon Peak vs CAL_TACK
Sasha Chekhtman (NRL) Muon peak = 0 for tack=-20 (avg. over logs)

3 CAL_LO: shaper time (all logs)
Sasha Chekhtman (NRL)

4 CAL_LO: Optimum CAL_TACK (all logs)
Sasha Chekhtman (NRL)

5 TKR 3-in-a-row: Muon Peak vs CAL_TACK
Sasha Chekhtman (NRL) Muon peak = 0 for tack=-20 (avg. over logs)

6 TKR 3-in-a-row: shaper time (all logs)
Sasha Chekhtman (NRL)

7 TKR 3-in-a-row: Optimum CAL_TACK (all logs)
Sasha Chekhtman (NRL)


Download ppt "08:00 Meeting Schedule TEM-PS test completed on Friday Sept. 26; baseline, test, and post-test data are burned to CD-ROM CAL cosmic data taking started."

Similar presentations


Ads by Google