Download presentation
Presentation is loading. Please wait.
1
Scandinavian-Mediterranean Corridor
European Coordinator Pat Cox Brussels, 23 March 2017
2
TEN-T – the bigger picture
Climate challenge - decarbonisation Intelligent Transport Systems Traditional and innovative financing Fiscal flexibility ScanMed - critical issues Brenner Base tunnel Fehmarn Belt Fixed link Access routes Alpha e (Hamburg-Bremen-Hannover) Accompanying measures Planning permits
3
Corridor alignment > 9300 KM rail > 6300 KM road 19 airports 25 seaports 44 rail road terminals
4
Compliance projection 2030 rail
5
Identified planned projects Number of projects and total costs
Rail 138 ERTMS 8 Rail/port 6 Rail/road 3 Road 101 Maritime 127 MoS 35 Airports 71 Multimodal 33 Innovation 21 Total projects Total costs €172 bn (representing 83% of the projects)
6
Thank you for your attention!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.