Download presentation
Presentation is loading. Please wait.
Published bySilvester Johnson Modified over 5 years ago
1
Project 2 ‘Promoting local music scene’ Week : 19th February 2018
Band pre production planning
2
Objective of this week Monday / Tuesday:
Define individual roles within the group Research and write about your individual role (please follow the guidance on week 6 PPP) Work as a group on Pitch power point presentation Work on all pre production planning Ensure that you have plan B in case things go wrong
3
Examples of last year students work
Task 1: Band research: Task 2: Interviews analysis Task 3: Pre – production paperwork : Task 4: Pitch (individual role within the project – role research and justification of responsibilities within the project) : :
4
Task 5: Analyse existing reviews
reviews-analysis/ analysis/ Task 6: Existing inspirational posters analysis ( for your own poster) : reviews/ Task 7: Finish products ( Video piece, Radio piece, Review piece, interactive Blog post) reviews-videos-and-podcasts/ : rise-of-heavy-metal-impuritas/
5
Weakly reflective logs:
kly-feedback/ Project evaluation: : rall-evalutation-project-2/
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.