Presentation is loading. Please wait.

Presentation is loading. Please wait.

S-NPP SDR Reprocess Status

Similar presentations


Presentation on theme: "S-NPP SDR Reprocess Status"— Presentation transcript:

1 S-NPP SDR Reprocess Status
Instrument Data Length Data Volume Processing Speed SW Version ATMS ~ 500 GB/year 5 hours/year ADL 4.2_Mx8.11 with updates CrIS (TSR) 16 TB/year 1 day/year ADL 5.3.1 VIIRS ~ ~ ~ ~ 200 TB/year 10 days/year ADL 4.2_Mx8.11 with updates OMPS (NP) 86 GB/year 2.8 hours/year OMPS (TC) 1 TB/year

2 S-NPP SDR Reprocess Status
Instrument Data Availability at STAR Note ATMS Reprocessed TDR/SDR/GEO /data/data246/wchen/ATMS-REP-V0 2.2 degree FOV size resampled TDR from reprocessed TDR /data/data246/gregk/Remap_Reprocess_TATMS/output_remap Data quality verification performed CrIS (TSR) N/A at STAR VIIRS Reprocessed SDR/GEO/Terrain Corrected GEO /data/data263/gregk/VIIRS_SDR No extended data quality verification performed OMPS (NP) Reprocessed SDR/GEO /data/data245/gregk Data migration ongoing OMPS (TC)


Download ppt "S-NPP SDR Reprocess Status"

Similar presentations


Ads by Google