Presentation is loading. Please wait.

Presentation is loading. Please wait.

DREAM Project CSA-ESA Bilateral Meeting 16 February, Frascati

Similar presentations


Presentation on theme: "DREAM Project CSA-ESA Bilateral Meeting 16 February, Frascati"— Presentation transcript:

1 DREAM Project CSA-ESA Bilateral Meeting 16 February, Frascati
Yves Coene , SPACEBEL Patrick Jacques, SPACEBEL

2 Outline Objectives Consortium Work Logic Work Breakdown Deliverables
Schedule & Milestones Frascati, 28 November 2011

3 Objectives Collect and identify current and future requirements from EMSA and EUSC including needs in terms of Sensors, missions and data provision Missions include ESA, TPM, or commercial Address technology, architecture and G/S interfaces needed to streamline planning, ordering and online data access to ESA and TPM for two identified institutions: i.e. EMSA and EUSC Exploit results of HMA standardisation activities Identify technology gaps and support evolution of technology and standards, e.g. by contributing specifications, implementations or participation to SWG and OGC Testbeds Frascati, 28 November 2011

4 Objectives Implement prototype that
Supports EUSC and EMSA business scenarios Demonstrates dynamic data transfer of EO data from PDGS to institutions decision support systems Defines technical interfaces between components Proposes interface to be exposed by the Sentinel 1 and 2 mission planning components to ensure future compatibility and “pluggability” Ensures data integrity and traceability of quality and accuracy metadata throughout data transfer process Takes into account available infrastructure and its future evolution including Sentinel PDGS-related projects ngEO and PDGS Evolution Framecontract Includes candidate multi-mission PDGS services Frascati, 28 November 2011

5 Consortium Frascati, 28 November 2011

6 Development Logic Phase 1 Phase 2 Task 2 Task 3 @SPB @ESRIN Task 10
System Requirements System Validation System Architecture System Integration System Implementation Scenarios SSS IRD SIR ATP (draft) ATR ATP SDD SIP (draft) SIP SIP (update) ATR (update) KO SRR PDR CDR TRR FAT AR Task 4, 5, 6, 7, 8, 12 @partner @SPB Sub-System Requirements Sub-System Validation Sub-System Architecture Sub-System Integration Sub-System Design & Implementation SRS SVP SDD (draft) ICD (draft) SRS (draft) SVP (draft) SDD ICD SUM SVR SUM (draft) SVR (update) SWRR DDR SS-FAT SS-AR Frascati, 28 November 2011

7 Work Logic – Phase 1 Frascati, 28 November 2011

8 Work Logic – Phase 2 Frascati, 28 November 2011

9 Work Breakdown + MAGELLIUM-UK Frascati, 28 November 2011

10 Work Breakdown Structure – Phase 1
Frascati, 28 November 2011

11 Work Breakdown Structure – Phase 1
Frascati, 28 November 2011

12 Schedule – Phase 1 Frascati, 28 November 2011

13 Milestones Frascati, 28 November 2011

14 Customer Furnished Items
Frascati, 28 November 2011


Download ppt "DREAM Project CSA-ESA Bilateral Meeting 16 February, Frascati"

Similar presentations


Ads by Google