Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08

Similar presentations


Presentation on theme: "TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08"— Presentation transcript:

1 TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
July 2008 doc.: IEEE /0830r0 September 2008 TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08 Date: Authors: Name Company Address Phone 5488 Marvell Lane, Santa Clara, CA, 95054 +1 (321) Bruce Kraemer Marvell marvell .com Sheung Li SiBEAM +1 (408) 555 Mathilda Ave, Sunnyvale, CA 94085 Adrian Stephens Intel Corporation 15 JJ Thompson +1 (503) intel.com Avenue, Cambridge, CB3 0FD, UK Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)

2 The TGn Streak Ensues with
July 2008 doc.: IEEE /0830r0 September 2008 TGn Draft 6.0 The TGn Streak Ensues with All 195 recirculation ballot comments resolved or withdrawn in one meeting Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)

3 July 2008 doc.: IEEE /0830r0 September 2008 TGn Motion Having approved comment resolutions for all of the comments received from LB134 on Draft 6.0, And having prepared Draft 7.0 containing all of the approved comment resolutions, Move to begin as soon as possible, a 15 day Working Group Recirculation Ballot asking the technical question “Should P802.11n Draft 7.0 be forwarded to Sponsor Ballot?” TG: 37 approve, 0 not approve, 0 abstain Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)

4 Primary Meeting Documents
July 2008 doc.: IEEE /0830r0 September 2008 Primary Meeting Documents Chair’s Opening Report r7 Chair’s Closing Report r0 Meeting Minutes r1 Editor’s Report r0 Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)

5 TGn Teleconference Plan
July 2008 doc.: IEEE /0830r0 September 2008 TGn Teleconference Plan Call time: 10:00 – 14:00 ET Call number: Wednesday Blocking events Ad hoc group Meeting chair Bridge # Passcode Sep 10 Interim Sep 17 Ballot Sep 24 Oct 01 TGn Oct 08 GEN 1hr, MAC 3hr Oct 15 Oct 22 PHY 2hr, COEX 2hr Oct 29 COEX 2hr, PHY 2hr Nov 05 TGn Misc Nov 12 Plenary Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)

6 TGn Current Timeline Event Name Accepted Dates Actual Predicted
July 2008 doc.: IEEE /0830r0 September 2008 TGn Current Timeline Event Name Accepted Dates Actual Predicted PAR Approved Sep ‘03 Initial WG Letter Ballot Mar ‘06 Recirculation WG Letter Ballot Oct ‘07 Form Sponsor Ballot Pool Sep ‘08 Initial Sponsor Ballot Nov ‘08 Recirculation Sponsor Ballot Jan ‘09 Final WG Approval Jul ‘09 Final EC Approval RevCom/ Stds Board Approval Sep ‘09 Publication Nov ‘09 Bruce Kraemer, Marvell Bruce Kraemer (Marvell), Sheung Li (SiBEAM)

7 Ad hoc in November 2008 May have an ad hoc meeting (as authorized)
September 2008 Ad hoc in November 2008 May have an ad hoc meeting (as authorized) on November 7-8 (Fri, Sat) in Dallas, TX at the Plenary Hotel (Hyatt Regency) for the purpose of resolving comments received during LB1xx on Draft 7.0 Bruce Kraemer, Marvell


Download ppt "TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08"

Similar presentations


Ads by Google