Presentation is loading. Please wait.

Presentation is loading. Please wait.

Liaison Report Date: Authors: January 2014 July 2013

Similar presentations


Presentation on theme: "Liaison Report Date: Authors: January 2014 July 2013"— Presentation transcript:

1 802.15 Liaison Report Date: 2014-01-24 Authors: January 2014 July 2013
January 2009September 2008 September 2008 doc.: IEEE /0924r0 January 2014 Liaison Report Date: Authors: Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

2 Abstract Liaison report on 802.15 as presented to 802.11 January 2014
September 2008 January 2009September 2008 July 2013 doc.: IEEE /0924r0 January 2014 Abstract Liaison report on as presented to Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

3 September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2014 IEEE SA is now rolling up 15.4e, 15.4f, 15.4g, 15.4j,15.4k onto amendments such as 4m, 4p, and 4s will be added if they are approved during the revision period Corrections found in will be applied to roll-up Document will be updated to include agreed upon ETSI changes Clause 4 – General Description (informative), will be editorially restructured to only include capability of the standard, i.e. move application information to an informative annex. Various annexes will be reviewed for applicability Review/change for editorial correctness Schedule Start Revision Effort: November, 2013 Letter Ballot Start: April, 2014 Sponsor Ballot Start: July, 2014 Approval: December, 2014 Slide 3 Slide 3 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 3 Page 3 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

4 September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2014 m TV White Space Recirculation Sponsor Ballot on IEEE m D5.0 closed December 20, Results: 113/0/ % 0 comments received Met conditions of conditional approval for publication Slide 4 Slide 4 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 4 Page 4 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

5 September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2014 n Chinese Medical Band Perfected d0P n_Draft_Standard.pdf Wrote: n-coexistence-assurance-document Initiated Letter Ballot Slide 5 Slide 5 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 5 Page 5 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

6 802.15.4p Rail Communications and Control
September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2014 p Rail Communications and Control Recirculation Sponsor Ballot on IEEE p D5.0 closed November 23, Results: 72/0/ % Passed 1 comment received (met editorial requirements) Met conditions of conditional approval for publication Slide 6 Slide 6 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 6 Page 6 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

7 802.15.4q Ultra Low Power Heard updated and merged proposals
September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2014 q Ultra Low Power Heard updated and merged proposals Identified a simulation task Slide 7 Slide 7 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 7 Page 7 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

8 802.15.8 Peer Aware Communications
September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2014 Peer Aware Communications Technical discussions for PFD and TGD DCN85r1: PFD completed (Byung-Jae Kwak and Shannon Park) DCN 66r0: Comments on TGD (Byung-Jae Kwak) DCN 716r1: Proposed text to PFD (Igor Dotlic) DCN 27r2: Report of teleconferences (Seungkwon Cho) DCN 737r1: A suggestion for harmonized PAC Frame Structure (Seungkwon Cho) DCN 2r2: PHY frame structures comparison and harmonization (Marco Hernandez) DCN 8r0: PFD Proposal (Byung-Jae Kwak) Completion of “PAC Framework Document (PFD)” Doc r1: Byung-Jae Kwak, Shannon Park Revised “Technical Guidance Document (TGD)” Doc r8: Byung-Jaw Kwak, Marco Hernandez, Shannon Park Approved “Call for contributions” Doc r0: Call for Contributions: Huan-Bang Li, Suhwook Kim, Myung Jong Lee Preliminary Contribution Proposals (mandatory) Submission due: March 12, 2014 Power point file format with Key features highlighted Final Contribution Proposals Submission due: May 5, 2014 Power point file format and Word Format with detailed simulation results Slide 8 Slide 8 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 8 Page 8 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

9 802.15.9 Key Management Protocol
September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2014 Key Management Protocol Reviewed progress on TG9 document predraft5_P _Draft_Standard.pdf In the private area Discussed document status Need serious work on SAP interfaces 6tsch as worst-case use case Goal of March for full document Issues with and security sections Processing logic Security PIBs Will make formal presentation to SC-M Hopefully will not need a 15.4 amendment to fix Slide 9 Slide 9 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 9 Page 9 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

10 802.15.10 Layer 2/Mesh Under Routing (L2R)
September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2014 Layer 2/Mesh Under Routing (L2R) Prepared Material for Joint Session w/802.1 Held Joint Session/Discussion w/802.1 Revised Tech. Guidance Doc. (# ) Merged in System Req. Spec. Reviewed Timeline (changes to be reflected in doc. # ) Heard (1) Presentation Slide 10 Slide 10 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 10 Page 10 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

11 Better Use of Spectrum Resources in WPANs (SRU) SG
September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2014 Better Use of Spectrum Resources in WPANs (SRU) SG Discussed about PAR document Heard presentation. Consideration on standardization process( ) by Takashi Yamamoto Heard presentation A Study on Radio Resource Measurement and Management( ) by Masa Ariyoshi Discussed action items for revising PAR Revise Time line Discussed about objective of SRU Slide 11 Slide 11 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 11 Page 11 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

12 September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2014 THz SG Working Drafts for PAR and 5C have been finalised for submission to the Working Group (Documents thz and thz). To support the technical claims made in the 5C the living document with references has been updated (to appear as Document thz) Working on the Technical Expectation Document (TED). The content of the TED has been discussed and updated (Document thz. Working on the living document on Study Group items (Document thz) The wish of the group is to establish an IG THz and beyond to discuss applications out of scope of SG 3d 100G. This IG should be established after the transition of the SG to the TG. Slide 12 Slide 12 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 12 Page 12 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

13 Optical Camera Communication SG
September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2014 Optical Camera Communication SG First meeting as Study Group Call for Applications about the amendment of IEEE and some study items of OCC Hearing of presentations about OCC including LED-ID services and digital signage services Draft PAR for OCC ( a) Draft 5C for OCC ( a) OCC Proposal of Scope of standardization and applications ( a) Synchronization and Flickering Issues of OCC ( a) Technical Issues for MIMO OCC ( a) Technical Topics for LED-based OCC ( a) Call for Applications document ( led) Discuss about the PAR and 5C Slide 13 Slide 13 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 13 Page 13 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

14 Ranging SG First meeting as Study Group
September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2014 Ranging SG First meeting as Study Group Several presentations in response to the CfA Discussion of PAR and CSD Approve PAR and CSD for forwarding to EC. Slide 14 Slide 14 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 14 Page 14 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

15 Dependable IG Review Discussion in Previous Meetings
September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2014 Dependable IG Review Discussion in Previous Meetings Heard Presentations Discussed Focused Use Cases requiring Dependability Medical Car Factory automation Disaster prevention Indoor positioning Energy flow control Building and smart city management Public safety Personal information space Government information Slide 15 Slide 15 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 15 Page 15 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

16 6TiSCH IG New Interest Group; looking at IETF 6TiSCH
September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2014 6TiSCH IG New Interest Group; looking at IETF 6TiSCH Reviewed objectives of 6TISCH project Reviewed MAC additions of IEEE e-2012 Started definition of IG goals and action items such as MAC mandatory behavior to support TSCH Slide 16 Slide 16 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 16 Page 16 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

17 September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2014 WNG SC Augmented Reality standards, use cases and requirements: How can contribute? LnL (Look-and-Link) Communications Intuitive device paring Slide 17 Slide 17 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 17 Page 17 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

18 September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 January 2014 Maintenance SC IEEE SA has not completed its rollup of e, f, g, j, k onto Discussion on timing and timing dependencies of acknowledgments and CSMA parameters were discussed, found to be broken via amendments after Note: ACK timing from is not broken A white paper describing timing issues and proposed resolution of the issues has been assigned to James Gilb, Cristina Seibert, and Ben Rolfe Slide 18 Slide 18 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics Page 18 Page 18 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

19 References This document All Documents
September 2008 May 2008 July 2013 January 2009September 2008 doc.: IEEE /0924r0 doc.: IEEE /0697r0 January 2014 References This document All Documents Current draft is in the members-only area  Members_Only_Area members log in using username and password Slide 19 Clint Chaplin, Samsung Electronics Page 19 Clint Chaplin, Samsung Clint Chaplin, Samsung Electronics


Download ppt "Liaison Report Date: Authors: January 2014 July 2013"

Similar presentations


Ads by Google